Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,176
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0415 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $146 | $50 | Implemented |
NC0415 # 05 Y:2010 | 05 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $911 | $1,846 | Implemented |
NC0415 # 06 Y:2010 | 06 | 2010 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $12,000 | $1,000 | Implemented |
NC0415 # 07 Y:2010 | 07 | 2010 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $8,000 | $15,750 | Implemented |
NC0406 # 01 Y:2010 | 01 | 2010 | ADOPT IN-HOUSE MATERIAL GENERATION | $77,083 | $85,000 | Not Implemented |
NC0406 # 02 Y:2010 | 02 | 2010 | TREAT AND REUSE RINSE WATERS | $51,487 | $8,875 | Not Implemented |
NC0406 # 03 Y:2010 | 03 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,177 | $50 | Implemented |
NC0406 # 04 Y:2010 | 04 | 2010 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $16,743 | $50,000 | Implemented |
NC0406 # 05 Y:2010 | 05 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,835 | $100 | Implemented |
NC0406 # 06 Y:2010 | 06 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,210 | $15,045 | Not Implemented |
NC0406 # 07 Y:2010 | 07 | 2010 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,747 | $8,000 | Not Implemented |
NC0406 # 08 Y:2010 | 08 | 2010 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $508 | $920 | Implemented |
NC0406 # 09 Y:2010 | 09 | 2010 | INSTALL OCCUPANCY SENSORS | $1,958 | $3,256 | Implemented |
NC0406 # 10 Y:2010 | 10 | 2010 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $276,388 | $214,700 | Implemented |
NC0406 # 11 Y:2010 | 11 | 2010 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $20,625 | $50,000 | Implemented |
NC0413 # 01 Y:2010 | 01 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,881 | $100 | Implemented |
NC0413 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,796 | $50 | Implemented |
NC0413 # 03 Y:2010 | 03 | 2010 | INSULATE FEEDWATER TANK | $283 | $337 | Implemented |
NC0413 # 04 Y:2010 | 04 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,066 | $1,000 | Implemented |
NC0413 # 05 Y:2010 | 05 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $67,233 | $190,000 | Not Implemented |
NC0412 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $140,256 | $442,314 | Implemented |
NC0412 # 02 Y:2010 | 02 | 2010 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $25,289 | $50 | Implemented |
NC0412 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,233 | $100 | Implemented |
NC0412 # 04 Y:2010 | 04 | 2010 | DEVELOP A REPAIR/REPLACE POLICY | $2,841 | $4,995 | Implemented |
NC0412 # 05 Y:2010 | 05 | 2010 | AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM | $7,153 | $15,100 | Implemented |