Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,985
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0284 # 06 Y:2004 | 06 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $914 | $887 | Not Implemented |
NC0284 # 07 Y:2004 | 07 | 2004 | ADJUST BURNERS FOR EFFICIENT OPERATION | $469 | $1,000 | Implemented |
NC0284 # 08 Y:2004 | 08 | 2004 | INSULATE BARE EQUIPMENT | $381 | $528 | Not Implemented |
NC0283 # 01 Y:2004 | 01 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $22,500 | $18,300 | Not Implemented |
NC0283 # 02 Y:2004 | 02 | 2004 | RECOVER AND REUSE COOLING WATER | $7,112 | $6,000 | Implemented |
NC0283 # 03 Y:2004 | 03 | 2004 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,469 | $1,200 | Implemented |
NC0283 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,379 | $6,899 | Not Implemented |
NC0283 # 05 Y:2004 | 05 | 2004 | INSTALL OCCUPANCY SENSORS | $1,077 | $356 | Implemented |
NC0281 # 03 Y:2004 | 03 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,625 | $35,000 | Not Implemented |
NC0281 # 04 Y:2004 | 04 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $10,838 | $6,000 | Not Implemented |
NC0281 # 05 Y:2004 | 05 | 2004 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $3,258 | $4,000 | Not Implemented |
NC0281 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,158 | $1,060 | Not Implemented |
NC0281 # 07 Y:2004 | 07 | 2004 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $700 | $400 | Not Implemented |
NC0281 # 01 Y:2004 | 01 | 2004 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $193,423 | $70,000 | Not Implemented |
NC0281 # 02 Y:2004 | 02 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $73,723 | $50 | Not Implemented |
NC0280 # 01 Y:2004 | 01 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $18,958 | $500 | Not Implemented |
NC0280 # 02 Y:2004 | 02 | 2004 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $69,623 | $360,000 | Not Implemented |
NC0280 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $109,628 | $121,591 | n/a |
NC0280 # 04 Y:2004 | 04 | 2004 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $24,049 | $79,415 | n/a |
NC0280 # 05 Y:2004 | 05 | 2004 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $19,146 | $6,453 | Not Implemented |
NC0280 # 06 Y:2004 | 06 | 2004 | ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM | $4,062 | $5,600 | Not Implemented |
NC0280 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,201 | $700 | Implemented |
NC0280 # 08 Y:2004 | 08 | 2004 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,341 | $2,060 | Not Implemented |
NC0280 # 09 Y:2004 | 09 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $745 | $686 | Not Implemented |
NC0276 # 01 Y:2004 | 01 | 2004 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,019 | $18,000 | Not Implemented |