IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,985

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0261 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $13,615 $5,261 Not Implemented
NC0261 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,891 $50 Implemented
NC0261 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,466 $6,430 Implemented
NC0261 # 06 Y:2003 06 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,314 $500 Not Implemented
NC0261 # 07 Y:2003 07 2003 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $910 $3,948 Not Implemented
NC0261 # 08 Y:2003 08 2003 MODIFY CURRENT INCENTIVE PROGRAM $406,000 $41,000 Not Implemented
NC0258 # 01 Y:2003 01 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $219,783 $413,700 Not Implemented
NC0258 # 02 Y:2003 02 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $58,067 $15,000 Not Implemented
NC0258 # 03 Y:2003 03 2003 BURN A LESS EXPENSIVE GRADE OF FUEL $182,984 $375,000 Not Implemented
NC0258 # 04 Y:2003 04 2003 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE $110,788 $400,000 Not Implemented
NC0258 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,508 $50 Implemented
NC0258 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $763 $1,147 Not Implemented
NC0258 # 07 Y:2003 07 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,881 $600 Implemented
NC0257 # 01 Y:2003 01 2003 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $169,269 $200,000 Not Implemented
NC0257 # 02 Y:2003 02 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $24,665 $10,000 Not Implemented
NC0257 # 03 Y:2003 03 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $42,749 $55,000 Not Implemented
NC0257 # 04 Y:2003 04 2003 BURN A LESS EXPENSIVE GRADE OF FUEL $335,124 $425,000 n/a
NC0257 # 05 Y:2003 05 2003 DEVELOP A REPAIR/REPLACE POLICY $8,216 $8,241 Implemented
NC0257 # 06 Y:2003 06 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $8,771 $2,118 Implemented
NC0257 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,455 $500 Implemented
NC0257 # 08 Y:2003 08 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,407 $840 Implemented
NC0257 # 09 Y:2003 09 2003 USE PHOTOCELL CONTROLS $1,346 $1,540 Implemented
NC0259 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $7,357 $1,650 Implemented
NC0259 # 02 Y:2003 02 2003 DEVELOP A REPAIR/REPLACE POLICY $3,711 $5,940 Implemented
NC0259 # 03 Y:2003 03 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,070 $0 Not Implemented