Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
178
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0275 # 01 Y:2003 | 01 | 2003 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $2,058 | $5,954 | Not Implemented |
NC0275 # 02 Y:2003 | 02 | 2003 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $25,721 | $63,800 | Not Implemented |
NC0275 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,010 | $4,120 | Not Implemented |
NC0275 # 04 Y:2003 | 04 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,207 | $4,563 | Implemented |
NC0275 # 03 Y:2003 | 03 | 2003 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $12,088 | $7,190 | Not Implemented |
NC0275 # 05 Y:2003 | 05 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $455 | $683 | Implemented |
NC0272 # 01 Y:2003 | 01 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $728 | $2,803 | Implemented |
NC0272 # 02 Y:2003 | 02 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,885 | $610 | Implemented |
NC0272 # 05 Y:2003 | 05 | 2003 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $351 | $900 | Not Implemented |
NC0272 # 03 Y:2003 | 03 | 2003 | RECOVER AND REUSE WASTE MATERIAL | $990 | $400 | Implemented |
NC0272 # 04 Y:2003 | 04 | 2003 | USE PHOTOCELL CONTROLS | $167 | $235 | Implemented |
NC0274 # 01 Y:2003 | 01 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $18,125 | $77,500 | Not Implemented |
NC0274 # 04 Y:2003 | 04 | 2003 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $9,743 | $36,000 | Not Implemented |
NC0274 # 05 Y:2003 | 05 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,021 | $1,000 | Implemented |
NC0274 # 03 Y:2003 | 03 | 2003 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,209 | $200 | Implemented |
NC0274 # 02 Y:2003 | 02 | 2003 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $36,152 | $81,000 | Not Implemented |
NC0274 # 06 Y:2003 | 06 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,705 | $2,885 | Not Implemented |
NC0273 # 03 Y:2003 | 03 | 2003 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $65 | $0 | Implemented |
NC0273 # 06 Y:2003 | 06 | 2003 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $879 | $390 | Implemented |
NC0273 # 02 Y:2003 | 02 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $232 | $83 | Implemented |
NC0273 # 01 Y:2003 | 01 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $705 | $500 | Not Implemented |
NC0273 # 04 Y:2003 | 04 | 2003 | INSTALL OCCUPANCY SENSORS | $51 | $104 | Not Implemented |
NC0273 # 05 Y:2003 | 05 | 2003 | USE PHOTOCELL CONTROLS | $137 | $200 | Not Implemented |
NC0271 # 04 Y:2003 | 04 | 2003 | ADOPT IN-HOUSE MATERIAL GENERATION | $56,248 | $120,000 | Not Implemented |
NC0271 # 06 Y:2003 | 06 | 2003 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $796 | $100 | Implemented |