IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

177

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0351 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $484 $100 Implemented
NC0351 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,475 $4,243 Not Implemented
NC0351 # 04 Y:2006 04 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $885 $1,000 Not Implemented
NC0351 # 02 Y:2006 02 2006 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,147 $2,800 Not Implemented
NC0351 # 07 Y:2006 07 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $58 $39 Implemented
NC0351 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $2,660 $9,688 Not Implemented
NC0351 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,135 $1,000 Implemented
NC0350 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $330 $100 Implemented
NC0350 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,138 $10,500 Not Implemented
NC0350 # 01 Y:2006 01 2006 RECOVER WASTE HEAT FROM EQUIPMENT $122,745 $114,000 Not Implemented
NC0350 # 04 Y:2006 04 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $15,381 $2,000 Not Implemented
NC0350 # 03 Y:2006 03 2006 USE OPTIMUM THICKNESS INSULATION $12,275 $1,000 Implemented
NC0349 # 02 Y:2006 02 2006 REDUCE EXCESS STEAM BLEEDING $23,110 $13,525 Not Implemented
NC0349 # 07 Y:2006 07 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,246 $5,000 Not Implemented
NC0349 # 06 Y:2006 06 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,087 $4,340 Not Implemented
NC0349 # 08 Y:2006 08 2006 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $5,891 $4,000 Not Implemented
NC0349 # 01 Y:2006 01 2006 ADJUST BURNERS FOR EFFICIENT OPERATION $18,045 $2,000 Not Implemented
NC0349 # 04 Y:2006 04 2006 INSULATE BARE EQUIPMENT $2,375 $1,000 Not Implemented
NC0349 # 05 Y:2006 05 2006 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $19,058 $28,785 Not Implemented
NC0349 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $3,668 $1,000 Not Implemented
NC0347 # 04 Y:2006 04 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,125 $22,000 Implemented
NC0347 # 05 Y:2006 05 2006 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,239 $5,000 Not Implemented
NC0347 # 01 Y:2006 01 2006 DEVELOP A REPAIR/REPLACE POLICY $6,708 $0 Implemented
NC0347 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $269 $283 Implemented
NC0347 # 06 Y:2006 06 2006 INSULATE BARE EQUIPMENT $95 $165 Not Implemented