IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

145

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0410 # 03 Y:2010 03 2010 DEVELOP A REPAIR/REPLACE POLICY $569 $580 Not Implemented
NC0410 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $118 $435 Not Implemented
NC0410 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,826 $100 Not Implemented
NC0410 # 01 Y:2010 01 2010 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $101,033 $272,411 Not Implemented
NC0410 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,167 $3,040 Not Implemented
NC0416 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $14,117 $50 Implemented
NC0416 # 07 Y:2010 07 2010 INSTALL OCCUPANCY SENSORS $415 $949 Implemented
NC0416 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,948 $100 Implemented
NC0416 # 01 Y:2010 01 2010 KEEP BOILER TUBES CLEAN $359,066 $411,700 Not Implemented
NC0416 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,679 $30,438 Not Implemented
NC0416 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $11,462 $6,800 Not Implemented
NC0416 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $284 $568 Implemented
NC0417 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $168 $199 Not Implemented
NC0417 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $2,865 $2,751 Not Implemented
NC0417 # 09 Y:2010 09 2010 USE PHOTOCELL CONTROLS $417 $122 Not Implemented
NC0417 # 04 Y:2010 04 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $739 $180 Not Implemented
NC0417 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $101,691 $362,675 Not Implemented
NC0417 # 06 Y:2010 06 2010 REPAIR OR REPLACE STEAM TRAPS $2,928 $1,000 Not Implemented
NC0417 # 05 Y:2010 05 2010 ADOPT IN-HOUSE MATERIAL GENERATION $26,671 $70,000 Not Implemented
NC0417 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $7,220 $2,500 Not Implemented
NC0417 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,199 $100 Implemented
NC0415 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $937 $50 Not Implemented
NC0415 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $1,465 $500 Not Implemented
NC0415 # 06 Y:2010 06 2010 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $12,000 $1,000 Implemented
NC0415 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $146 $50 Implemented