Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
63
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0658 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $170 | $400 | n/a |
NC0658 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,952 | $4,258 | n/a |
NC0658 # 04 Y:2020 | 04 | 2020 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $92,941 | $500 | n/a |
NC0658 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,055 | $3,000 | n/a |
NC0658 # 02 Y:2020 | 02 | 2020 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $23,051 | $15,000 | n/a |
NC0658 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,619 | $5,000 | n/a |
NC0657 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $592 | $400 | Not Implemented |
NC0657 # 02 Y:2020 | 02 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $194 | $493 | Implemented |
NC0657 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,055 | $3,404 | Not Implemented |
NC0657 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,082 | $5,265 | Implemented |
NC0657 # 05 Y:2020 | 05 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,980 | $30,000 | Not Implemented |
NC0655 # 03 Y:2020 | 03 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $12,039 | $500 | Not Implemented |
NC0655 # 02 Y:2020 | 02 | 2020 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $49,654 | $612,000 | Not Implemented |
NC0655 # 01 Y:2020 | 01 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $92,988 | $168,000 | Not Implemented |
NC0655 # 04 Y:2020 | 04 | 2020 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $310 | $500 | Implemented |
NC0654 # 01 Y:2020 | 01 | 2020 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,381,024 | $8,000,000 | Not Implemented |
NC0654 # 04 Y:2020 | 04 | 2020 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $1,543 | $6,700 | Not Implemented |
NC0654 # 05 Y:2020 | 05 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $44,735 | $130,000 | Not Implemented |
NC0654 # 03 Y:2020 | 03 | 2020 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $11,303 | $20,000 | Not Implemented |
NC0654 # 02 Y:2020 | 02 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,030 | $75,000 | Not Implemented |
NC0652 # 02 Y:2020 | 02 | 2020 | INSTALL OCCUPANCY SENSORS | $631 | $700 | Implemented |
NC0652 # 03 Y:2020 | 03 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $465 | $390 | Implemented |
NC0652 # 01 Y:2020 | 01 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,160 | $100 | Not Implemented |
NC0652 # 04 Y:2020 | 04 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $11,865 | $500 | Implemented |
NC0652 # 06 Y:2020 | 06 | 2020 | CONDENSE OPERATION INTO ONE BUILDING | $6,086 | $4,800 | Not Implemented |