Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
313
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0075 # 04 Y:2022 | 04 | 2022 | INSULATE BARE EQUIPMENT | $980 | $404 | Implemented |
NL0075 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,087 | $1,652 | Implemented |
NL0075 # 01 Y:2022 | 01 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $13,412 | $7,500 | Implemented |
NL0073 # 05 Y:2022 | 05 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $772 | $58 | Implemented |
NL0073 # 04 Y:2022 | 04 | 2022 | USE OTHER WASTE CONCENTRATION METHODS | $1,144 | $1,258 | Implemented |
NL0073 # 02 Y:2022 | 02 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $7,537 | $35,000 | Implemented |
NL0073 # 01 Y:2022 | 01 | 2022 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $16,217 | $225,000 | Implemented |
NL0072 # 03 Y:2022 | 03 | 2022 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $2,055 | $266 | Implemented |
NL0072 # 02 Y:2022 | 02 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,761 | $20,400 | Implemented |
NL0072 # 01 Y:2022 | 01 | 2022 | REPLACE BOILER | $18,966 | $23,925 | Implemented |
NL0071 # 05 Y:2022 | 05 | 2022 | INSULATE BARE EQUIPMENT | $2,400 | $9,724 | Implemented |
NL0071 # 02 Y:2022 | 02 | 2022 | MINIMIZE WATER USAGE | $106,955 | $72,150 | Implemented |
NL0071 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $21,879 | $30,410 | Implemented |
NL0071 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,447 | $4,500 | Implemented |
NL0071 # 07 Y:2022 | 07 | 2022 | INSULATE BARE EQUIPMENT | $407 | $2,521 | Implemented |
NL0070 # 08 Y:2022 | 08 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $490 | $854 | Implemented |
NL0070 # 07 Y:2022 | 07 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $675 | $3,315 | Implemented |
NL0070 # 06 Y:2022 | 06 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,590 | $23,500 | Implemented |
NL0070 # 03 Y:2022 | 03 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $26,148 | $35 | Implemented |
NL0070 # 02 Y:2022 | 02 | 2022 | UPGRADE CONTROLS ON COMPRESSORS | $32,832 | $16,500 | Implemented |
NL0068 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,608 | $5,394 | Implemented |
NL0068 # 04 Y:2022 | 04 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,339 | $4,500 | Implemented |
NL0068 # 03 Y:2022 | 03 | 2022 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $17,011 | $25,884 | Implemented |
NL0068 # 02 Y:2022 | 02 | 2022 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $20,357 | $960 | Implemented |
NL0068 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,258 | $7,000 | Implemented |