IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

589

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NL0077 # 02 Y:2023 02 2023 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $121,895 $4,200 Implemented
NL0077 # 03 Y:2023 03 2023 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $36,689 $350 Not Implemented
NL0077 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,279 $4,500 Implemented
NL0077 # 05 Y:2023 05 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,997 $470 Not Implemented
NL0077 # 06 Y:2023 06 2023 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $527 $200 Implemented
NL0076 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $42,345 $20,000 Not Implemented
NL0076 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $24,481 $25,000 Not Implemented
NL0076 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,256 $4,500 Implemented
NL0076 # 04 Y:2022 04 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,880 $12,650 Not Implemented
NL0076 # 05 Y:2022 05 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,194 $140 Implemented
NL0076 # 06 Y:2022 06 2022 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $4,338 $7,210 Implemented
NL0076 # 07 Y:2022 07 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,084 $35 Not Implemented
NL0075 # 01 Y:2022 01 2022 AIR CONDITION ONLY SPACE NECESSARY $13,412 $7,500 Implemented
NL0075 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $7,755 $28,900 Not Implemented
NL0075 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,087 $1,652 Implemented
NL0075 # 04 Y:2022 04 2022 INSULATE BARE EQUIPMENT $980 $404 Implemented
NL0075 # 05 Y:2022 05 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $635 $575 Not Implemented
NL0074 # 01 Y:2022 01 2022 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $214,263 $4,242 Not Implemented
NL0074 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $72,974 $20,000 Not Implemented
NL0074 # 03 Y:2022 03 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,687 $5,590 Not Implemented
NL0074 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,436 $19,905 Not Implemented
NL0074 # 05 Y:2022 05 2022 REDUCE VENTILATION AIR $1,627 $450 Not Implemented
NL0074 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $859 $1,225 Not Implemented
NL0074 # 07 Y:2022 07 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $432 $90 Not Implemented
NL0073 # 01 Y:2022 01 2022 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $16,217 $225,000 Implemented