Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
45
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NL0082 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $314 | $881 | n/a |
NL0082 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $365 | $1,917 | n/a |
NL0082 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,690 | $2,500 | n/a |
NL0082 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,917 | $6,850 | n/a |
NL0082 # 02 Y:2023 | 02 | 2023 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $14,674 | $80,927 | n/a |
NL0082 # 01 Y:2023 | 01 | 2023 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $676,628 | $1,200,000 | n/a |
NL0077 # 02 Y:2023 | 02 | 2023 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $121,895 | $4,200 | Implemented |
NL0077 # 01 Y:2023 | 01 | 2023 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $150,762 | $690,000 | Not Implemented |
NL0077 # 03 Y:2023 | 03 | 2023 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $36,689 | $350 | Not Implemented |
NL0077 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,279 | $4,500 | Implemented |
NL0077 # 05 Y:2023 | 05 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,997 | $470 | Not Implemented |
NL0077 # 06 Y:2023 | 06 | 2023 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $527 | $200 | Implemented |
NL0062 # 07 Y:2022 | 07 | 2022 | AIR CONDITION ONLY SPACE NECESSARY | $424 | $50,000 | Implemented |
NL0062 # 06 Y:2022 | 06 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,261 | $918 | Not Implemented |
NL0062 # 05 Y:2022 | 05 | 2022 | RECOVER AND REUSE WASTE MATERIAL | $1,313 | $440 | Not Implemented |
NL0062 # 04 Y:2022 | 04 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,413 | $660 | Implemented |
NL0062 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,498 | $18,517 | Implemented |
NL0062 # 02 Y:2022 | 02 | 2022 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,581 | $24,336 | Implemented |
NL0062 # 01 Y:2022 | 01 | 2022 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $45,354 | $242,300 | Not Implemented |
NL0060 # 03 Y:2021 | 03 | 2021 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $908 | $1,790 | Implemented |
NL0060 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,978 | $8,057 | Implemented |
NL0060 # 01 Y:2021 | 01 | 2021 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,780 | $6,000 | Implemented |
NL0042 # 08 Y:2019 | 08 | 2019 | INSTALL OCCUPANCY SENSORS | $214 | $1,050 | Not Implemented |
NL0042 # 07 Y:2019 | 07 | 2019 | COMBINE UTILITY METERS | $565 | $1,250 | Not Implemented |
NL0042 # 06 Y:2019 | 06 | 2019 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,989 | $2,400 | Not Implemented |