IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,536

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0903 # 04 Y:2015 04 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,633 $30,000 Implemented
OK0903 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,183 $950 Implemented
OK0903 # 10 Y:2015 10 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,904 $10,062 Implemented
OK0902 # 02 Y:2015 02 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $739 $468 Implemented
OK0902 # 11 Y:2015 11 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $904 $520 Implemented
OK0902 # 12 Y:2015 12 2015 INSULATE BARE EQUIPMENT $44,461 $58,968 Implemented
OK0902 # 13 Y:2015 13 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $48,188 $144,447 Implemented
OK0902 # 14 Y:2015 14 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $520 $1,320 Implemented
OK0900 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,054 $2,932 Implemented
OK0900 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $761 $2,775 Implemented
OK0899 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,648 $3,905 Implemented
OK0899 # 02 Y:2014 02 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,062 $9,740 Implemented
OK0899 # 03 Y:2014 03 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $506 $594 Implemented
OK0899 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,496 $1,342 Implemented
OK0898 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,132 $1,689 Implemented
OK0898 # 04 Y:2014 04 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $303 $270 Implemented
OK0898 # 07 Y:2014 07 2014 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $136 $463 Implemented
OK0898 # 10 Y:2014 10 2014 USE OPTIMUM THICKNESS INSULATION $6,545 $27,400 Implemented
OK0897 # 01 Y:2014 01 2014 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,056 $0 Implemented
OK0897 # 02 Y:2014 02 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,440 $1,188 Implemented
OK0897 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $2,796 $2,066 Implemented
OK0897 # 04 Y:2014 04 2014 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $248 $0 Implemented
OK0897 # 05 Y:2014 05 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,000 $10,067 Implemented
OK0897 # 06 Y:2014 06 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,792 $1,656 Implemented
OK0897 # 07 Y:2014 07 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,545 $3,641 Implemented