IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

693

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0660 # 02 Y:2003 02 2003 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,638 $7,445 Implemented
OK0660 # 03 Y:2003 03 2003 INSULATE BARE EQUIPMENT $279 $300 Implemented
OK0660 # 04 Y:2003 04 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,891 $450 Implemented
OK0660 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $930 $1,017 Not Implemented
OK0660 # 06 Y:2003 06 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $996 $4,003 Implemented
OK0660 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,433 $113,760 Not Implemented
OK0660 # 08 Y:2003 08 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,839 $1,606 Implemented
OK0660 # 09 Y:2003 09 2003 RECOVER AND REUSE COOLING WATER $23,652 $4,495 Not Implemented
OK0659 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,223 $640 Implemented
OK0659 # 02 Y:2003 02 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,179 $4,683 Implemented
OK0659 # 03 Y:2003 03 2003 INSTALL OCCUPANCY SENSORS $1,247 $927 Not Implemented
OK0659 # 04 Y:2003 04 2003 INSULATE BARE EQUIPMENT $8,627 $31,408 Not Implemented
OK0659 # 05 Y:2003 05 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $52,195 $19,043 n/a
OK0659 # 06 Y:2003 06 2003 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $7,958 $100 Implemented
OK0659 # 07 Y:2003 07 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,802 $152,022 Not Implemented
OK0659 # 08 Y:2003 08 2003 $325,000 $625,000 n/a
OK0631 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,487 $400 Implemented
OK0631 # 02 Y:2001 02 2001 INSULATE BARE EQUIPMENT $13,831 $8,000 Implemented
OK0631 # 03 Y:2001 03 2001 ADD AREA LIGHTING SWITCHES $1,991 $194 Implemented
OK0631 # 04 Y:2001 04 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,478 $6,067 Implemented
OK0631 # 05 Y:2001 05 2001 $174,720 $364,000 Implemented
OK0625 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,900 $360 Implemented
OK0625 # 02 Y:2001 02 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,851 $84 Implemented
OK0625 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $376 $476 Implemented
OK0625 # 04 Y:2001 04 2001 INSTALL SET-BACK TIMERS $2,642 $1,408 Not Implemented