Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

151

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0639 # 04 Y:2002 04 2002 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $1,338 $4,126 Not Implemented
OK0639 # 05 Y:2002 05 2002 INSTALL SET-BACK TIMERS $6,583 $160 Implemented
OK0639 # 06 Y:2002 06 2002 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $6,380 $14,226 Implemented
OK0638 # 01 Y:2002 01 2002 INSTALL SET-BACK TIMERS $6,131 $0 Not Implemented
OK0638 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,120 $6,442 Implemented
OK0638 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $1,798 $862 Implemented
OK0638 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $485 $0 Not Implemented
OK0638 # 05 Y:2002 05 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,536 $500 Not Implemented
OK0638 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $623 $1,067 Implemented
OK0638 # 07 Y:2002 07 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $11,046 $10 Not Implemented
OK0637 # 01 Y:2002 01 2002 INSTALL SET-BACK TIMERS $503 $2 Not Implemented
OK0637 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $91 $185 Implemented
OK0637 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,484 $0 Implemented
OK0637 # 04 Y:2002 04 2002 $5,814 $8,286 Implemented
OK0637 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,882 $630 Implemented
OK0636 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,565 $16,300 Implemented
OK0636 # 02 Y:2002 02 2002 COVER OPEN TANKS $2,412 $528 Not Implemented
OK0636 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $6,525 $1,500 Not Implemented
OK0636 # 04 Y:2002 04 2002 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $175,200 $12,800 Implemented
OK0636 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,410 $1,400 Implemented
OK0636 # 06 Y:2002 06 2002 BURN WOOD BY-PRODUCTS FOR HEAT $15,400 $22,800 Not Implemented
OK0635 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,947 $9,900 Not Implemented
OK0635 # 02 Y:2002 02 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,136 $4,000 Not Implemented
OK0635 # 03 Y:2002 03 2002 INSTALL / REPAIR INSULATION ON STEAM LINES $9,648 $6,750 Not Implemented
OK0635 # 04 Y:2002 04 2002 INSULATE BARE EQUIPMENT $4,152 $1,635 Not Implemented