IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0939 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $269 $0 Implemented
OK0934 # 04 Y:2016 04 2016 INSULATE BARE EQUIPMENT $63,243 $3,161 Implemented
OK0934 # 03 Y:2016 03 2016 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $134,039 $1,300 Implemented
OK0927 # 02 Y:2015 02 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $21,107 $133,275 Implemented
OK0926 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,480 $22,750 Implemented
OK0921 # 04 Y:2015 04 2015 INSTALL DESICCANT HUMIDITY CONTROL SYSTEM $89,313 $72,000 Implemented
OK0921 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $13,915 $4,348 Implemented
OK0921 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,838 $28,060 Implemented
OK0921 # 05 Y:2015 05 2015 REDUCE FLUID FLOW RATES $32,332 $5,000 Implemented
OK0917 # 06 Y:2015 06 2015 USE OPTIMUM TEMPERATURE $8,870 $180 Implemented
OK0917 # 02 Y:2015 02 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,154 $72 Implemented
OK0917 # 04 Y:2015 04 2015 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,875 $2,000 Implemented
OK0917 # 03 Y:2015 03 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $537 $55 Implemented
OK0917 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $689 $577 Implemented
OK0908 # 03 Y:2015 03 2015 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $621 $432 Implemented
OK0908 # 01 Y:2015 01 2015 OPTIMIZE PLANT POWER FACTOR $6,429 $11,430 Implemented
OK0904 # 07 Y:2015 07 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,742 $950 Implemented
OK0904 # 11 Y:2015 11 2015 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,141 $1,500 Implemented
OK0904 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,742 $950 Implemented
OK0904 # 02 Y:2015 02 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $5,563 $180 Implemented
OK0904 # 01 Y:2015 01 2015 OPTIMIZE PLANT POWER FACTOR $4,880 $14,220 Implemented
OK0904 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $1,292 $2,535 Implemented
OK0900 # 01 Y:2014 01 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,054 $2,932 Implemented
OK0900 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $761 $2,775 Implemented
OK0899 # 04 Y:2014 04 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,496 $1,342 Implemented