IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0768 # 15 Y:2008 15 2008 IMPROVE COMBUSTION CONTROL CAPABILITY $131,460 $41,080 Implemented
OK0756 # 03 Y:2008 03 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,491 $1,000 Implemented
OK0755 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,231 $4,120 Implemented
OK0755 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $949 $2,196 Implemented
OK0755 # 06 Y:2008 06 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,008 $28,144 Implemented
OK0755 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $960 $2,000 Implemented
OK0755 # 09 Y:2008 09 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $150 Implemented
OK0755 # 10 Y:2008 10 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,540 $0 Implemented
OK0754 # 04 Y:2007 04 2007 RECOVER WASTE HEAT FROM EQUIPMENT $3,351 $4,638 Implemented
OK0754 # 05 Y:2007 05 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,311 $814 Implemented
OK0754 # 07 Y:2007 07 2007 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $32,400 $320 Implemented
OK0754 # 09 Y:2007 09 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $8,086 $0 Implemented
OK0746 # 01 Y:2007 01 2007 INSTALL / REPAIR INSULATION ON STEAM LINES $32,026 $30,757 Implemented
OK0746 # 04 Y:2007 04 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,580 $4,541 Implemented
OK0746 # 05 Y:2007 05 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,287 $3,000 Implemented
OK0746 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,881 $3,256 Implemented
OK0746 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,881 $0 Implemented
OK0740 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,981 $360 Implemented
OK0736 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $224,746 $154,440 Implemented
OK0736 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $29,250 $20,340 Implemented
OK0736 # 04 Y:2006 04 2006 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $8,438 $765 Implemented
OK0736 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,322 $1,267 Implemented
OK0732 # 01 Y:2006 01 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,149 $2,491 Implemented
OK0732 # 03 Y:2006 03 2006 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $18,843 $17,500 Implemented
OK0732 # 04 Y:2006 04 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $1,602 $1,223 Implemented