Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

103

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1054 # 03 Y:2021 03 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $624 $2,620 Implemented
OK1054 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,347 $2,505 Implemented
OK1053 # 06 Y:2021 06 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,195 $3,190 Implemented
OK1053 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,980 $0 Implemented
OK1053 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,155 $26,670 Implemented
OK1053 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,462 $16,440 Implemented
OK1003 # 07 Y:2019 07 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $48,286 $9,545 Implemented
OK1003 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,476 $56,018 Implemented
OK1003 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,094 $11,817 Implemented
OK1003 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,820 $1,545 Implemented
OK1003 # 05 Y:2019 05 2019 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,817 $1,400 Implemented
OK0943 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,334 $21,372 Implemented
OK0943 # 01 Y:2016 01 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $40,741 $19,000 Implemented
OK0943 # 08 Y:2016 08 2016 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $5,953 $4,600 Implemented
OK0943 # 12 Y:2016 12 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $861 $4,032 Implemented
OK0943 # 09 Y:2016 09 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,934 $2,720 Implemented
OK0943 # 10 Y:2016 10 2016 INSTALL SET-BACK TIMERS $1,250 $790 Implemented
OK0943 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,211 $0 Implemented
OK0943 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $645 $1,405 Implemented
OK0943 # 02 Y:2016 02 2016 PAY UTILITY BILLS ON TIME $21,826 $0 Implemented
OK0943 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,445 $11,700 Implemented
OK0942 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $972 $4,623 Implemented
OK0942 # 01 Y:2016 01 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,767 $3,112 Implemented
OK0942 # 05 Y:2016 05 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $600 $3,450 Implemented
OK0941 # 03 Y:2016 03 2016 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $1,497 $1,960 Implemented