Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
30
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0680 # 03 Y:2017 | 03 | 2017 | ADJUST BURNERS FOR EFFICIENT OPERATION | $2,467 | $1,000 | Implemented |
OR0680 # 04 Y:2017 | 04 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,732 | $3,529 | Implemented |
OR0680 # 01 Y:2017 | 01 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $45,000 | $66,392 | Implemented |
ORS005 # 10 Y:1999 | 10 | 1999 | USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE | $0 | $490 | Implemented |
ORS005 # 09 Y:1999 | 09 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $310,000 | $69,000 | Implemented |
ORS005 # 05 Y:1999 | 05 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,920 | $700 | Implemented |
ORS005 # 04 Y:1999 | 04 | 1999 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $18,500 | $40,000 | Implemented |
ORS005 # 03 Y:1999 | 03 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $55,755 | $0 | Implemented |
ORS005 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,531 | $41,296 | Implemented |
ORS004 # 11 Y:1999 | 11 | 1999 | MINIMIZE WATER USAGE | $2,930 | $0 | Implemented |
ORS004 # 01 Y:1999 | 01 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $24,048 | $0 | Implemented |
ORS004 # 03 Y:1999 | 03 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,758 | $4,840 | Implemented |
ORS004 # 04 Y:1999 | 04 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,658 | $19,518 | Implemented |
ORS004 # 08 Y:1999 | 08 | 1999 | OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS | $8,525 | $1,270 | Implemented |
ORS004 # 09 Y:1999 | 09 | 1999 | MINIMIZE WATER USAGE | $14,760 | $6,800 | Implemented |
ORS003 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,492 | $7,459 | Implemented |
ORS003 # 03 Y:1999 | 03 | 1999 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $39,677 | $20,000 | Implemented |
ORS003 # 05 Y:1999 | 05 | 1999 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,140 | $700 | Implemented |
ORS003 # 08 Y:1999 | 08 | 1999 | USE OTHER WASTE CONCENTRATION METHODS | $39,020 | $34,600 | Implemented |
ORS003 # 09 Y:1999 | 09 | 1999 | INSTALL EQUIPMENT TO MOVE PRODUCT | $80,220 | $15,400 | Implemented |
ORS002 # 04 Y:1999 | 04 | 1999 | REPLACE BOILER | $12,100 | $0 | Implemented |
ORS002 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $13,472 | $27,939 | Implemented |
ORS002 # 02 Y:1999 | 02 | 1999 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,055 | $15,400 | Implemented |
ORS002 # 08 Y:1999 | 08 | 1999 | REPLACE WATER COOLING ON PROCESSES WITH AIR COOLING | $5,954 | $0 | Implemented |
ORS002 # 05 Y:1999 | 05 | 1999 | INSTALL AUTOMATIC PACKING EQUIPMENT | $166,000 | $121,000 | Implemented |