Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
528
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0777 # 02 Y:2023 | 02 | 2023 | INSTALL COMMON HEADER ON COMPRESSORS | $2,832 | $6,989 | Implemented |
OR0777 # 01 Y:2023 | 01 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,479 | $0 | Implemented |
OR0777 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,570 | $0 | Implemented |
OR0737 # 04 Y:2021 | 04 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,884 | $0 | Implemented |
OR0737 # 05 Y:2021 | 05 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $3,820 | $8,556 | Implemented |
OR0732 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $20,378 | $0 | Implemented |
OR0723 # 03 Y:2019 | 03 | 2019 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $5,360 | $1,789 | Implemented |
OR0723 # 01 Y:2019 | 01 | 2019 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $488,033 | $1,500,000 | Implemented |
OR0720 # 03 Y:2019 | 03 | 2019 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $4,330 | $1,100 | Implemented |
OR0720 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $31,433 | $68,000 | Implemented |
OR0719 # 01 Y:2019 | 01 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,576 | $12,018 | Implemented |
OR0719 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $7,063 | $6,896 | Implemented |
OR0719 # 03 Y:2019 | 03 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,031 | $9,861 | Implemented |
OR0712 # 06 Y:2018 | 06 | 2018 | USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS | $6,403 | $30,000 | Implemented |
OR0712 # 01 Y:2018 | 01 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $200,991 | $689,600 | Implemented |
OR0712 # 05 Y:2018 | 05 | 2018 | INSULATE BARE EQUIPMENT | $17,619 | $17,511 | Implemented |
OR0691 # 02 Y:2017 | 02 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,762 | $1,200 | Implemented |
OR0691 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $955 | $1,955 | Implemented |
OR0690 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,285 | $2,321 | Implemented |
OR0688 # 02 Y:2017 | 02 | 2017 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $9,221 | $180,000 | Implemented |
OR0688 # 01 Y:2017 | 01 | 2017 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,431 | $448 | Implemented |
OR0683 # 01 Y:2017 | 01 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $19,831 | $19,940 | Implemented |
OR0683 # 03 Y:2017 | 03 | 2017 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $4,107 | $670 | Implemented |
OR0675 # 03 Y:2016 | 03 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $22,809 | $23,810 | Implemented |
OR0675 # 01 Y:2016 | 01 | 2016 | INSTALL EQUIPMENT TO MOVE PRODUCT | $79,123 | $89,654 | Implemented |