IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

57

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0623 # 02 Y:2013 02 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,199 $1,260 Not Implemented
OR0623 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $8,023 $9,452 Not Implemented
OR0623 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $6,693 $1,500 Implemented
OR0623 # 04 Y:2013 04 2013 MODIFY STARTUP/SHUTDOWN TIMES $2,617 $2,500 Not Implemented
OR0623 # 01 Y:2013 01 2013 MODIFY STARTUP/SHUTDOWN TIMES $7,500 $700 Not Implemented
OR0623 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,460 $11,957 Not Implemented
OR0537 # 08 Y:2008 08 2008 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $179,500 $279,600 Not Implemented
OR0537 # 05 Y:2008 05 2008 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $4,386 $18,550 Not Implemented
OR0537 # 06 Y:2008 06 2008 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,113 $0 Implemented
OR0537 # 02 Y:2008 02 2008 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $56,459 $10,000 Not Implemented
OR0537 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $10,283 $27,375 Not Implemented
OR0537 # 07 Y:2008 07 2008 USE OPTIMUM THICKNESS INSULATION $11,928 $5,611 Not Implemented
OR0537 # 01 Y:2008 01 2008 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $34,473 $24,900 Not Implemented
OR0537 # 03 Y:2008 03 2008 REDUCE SCRAP PRODUCTION $131,635 $140,000 Not Implemented
OR0386 # 02 Y:2001 02 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $12,600 $0 Implemented
OR0386 # 04 Y:2001 04 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,607 $3,763 Implemented
OR0386 # 03 Y:2001 03 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,007 $0 Implemented
OR0386 # 01 Y:2001 01 2001 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $11,500 $10,500 Not Implemented
OR0386 # 05 Y:2001 05 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,184 $0 Implemented
OR0383 # 04 Y:2000 04 2000 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $38,785 $45,275 Implemented
OR0383 # 07 Y:2000 07 2000 OPTIMIZE PLANT POWER FACTOR $4,282 $11,900 Not Implemented
OR0383 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $43,523 $3,525 Implemented
OR0383 # 06 Y:2000 06 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,870 $18,000 Implemented
OR0383 # 02 Y:2000 02 2000 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $114,832 $600 Implemented
OR0383 # 05 Y:2000 05 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $26,070 $28,457 Implemented