IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,401

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0661 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,243 $7,340 Implemented
SD0661 # 13 Y:2024 13 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,043 $19,842 Implemented
SD0661 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,348 $676 Implemented
SD0661 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $641,754 $589,764 Implemented
SD0661 # 05 Y:2024 05 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $10,205 $0 Implemented
SD0661 # 02 Y:2024 02 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $1,321,862 $54,390 Implemented
SD0661 # 06 Y:2024 06 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,354 $0 Implemented
SD0661 # 11 Y:2024 11 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $1,863 Implemented
SD0661 # 07 Y:2024 07 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $854 $250 Implemented
SD0659 # 09 Y:2024 09 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,401 $2,880 Implemented
SD0659 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $42,562 $0 Implemented
SD0659 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $86,343 $34,702 Implemented
SD0657 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,534 $5,677 Implemented
SD0657 # 06 Y:2024 06 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,186 $10,841 Implemented
SD0657 # 07 Y:2024 07 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,983 $13,634 Implemented
SD0657 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,484 $6,349 Implemented
SD0656 # 10 Y:2024 10 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,299 $3,896 Implemented
SD0656 # 07 Y:2024 07 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,422 $2,040 Implemented
SD0656 # 09 Y:2024 09 2024 PREVENT EXCESSIVE SOLVENT USAGE (OPERATOR TRAINING) $35,678 $51,900 Implemented
SD0656 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,188 $500 Implemented
SD0652 # 08 Y:2024 08 2024 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $4,393 $6,286 Implemented
SD0652 # 09 Y:2024 09 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $978 $4,000 Implemented
SD0652 # 10 Y:2024 10 2024 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,579 $33,698 Implemented
SD0652 # 13 Y:2024 13 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,703 $2,400 Implemented
SD0652 # 03 Y:2024 03 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $142,534 $0 Implemented