Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,995
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0607 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,963 | $344 | n/a |
SF0607 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,168 | $0 | n/a |
SF0606 # 04 Y:2023 | 04 | 2023 | INSULATE BARE EQUIPMENT | $5,279 | $5,910 | n/a |
SF0606 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,495 | $1,440 | n/a |
SF0606 # 02 Y:2023 | 02 | 2023 | USE MINIMUM STEAM OPERATING PRESSURE | $5,475 | $60 | n/a |
SF0606 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,107 | $564 | n/a |
SF0606 # 05 Y:2023 | 05 | 2023 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,502 | $8,173 | n/a |
SF0606 # 06 Y:2023 | 06 | 2023 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $7,028 | $31,579 | n/a |
SF0606 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $112,666 | $923,010 | n/a |
SF0605 # 07 Y:2023 | 07 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $129,996 | $428,510 | n/a |
SF0605 # 06 Y:2023 | 06 | 2023 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $21,756 | $37,440 | n/a |
SF0605 # 05 Y:2023 | 05 | 2023 | INSULATE BARE EQUIPMENT | $233 | $1,287 | n/a |
SF0605 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $2,116 | $10,832 | n/a |
SF0605 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $28,696 | $38,888 | n/a |
SF0605 # 02 Y:2023 | 02 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $848 | $420 | n/a |
SF0605 # 01 Y:2023 | 01 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $24,945 | $4,958 | n/a |
SF0604 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $65,157 | $47,904 | n/a |
SF0604 # 01 Y:2023 | 01 | 2023 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $33,778 | $1,120 | n/a |
SF0604 # 02 Y:2023 | 02 | 2023 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $21,457 | $280 | n/a |
SF0604 # 03 Y:2023 | 03 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,745 | $1,883 | n/a |
SF0604 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,264 | $2,879 | n/a |
SF0604 # 06 Y:2023 | 06 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,142 | $8,611 | n/a |
SF0603 # 04 Y:2023 | 04 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,008 | $7,651 | Implemented |
SF0603 # 05 Y:2023 | 05 | 2023 | USE PHOTOCELL CONTROLS | $3,805 | $9,018 | Implemented |
SF0603 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,760 | $1,440 | Implemented |