Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,950
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0675 # 07 Y:2000 | 07 | 2000 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,844 | $0 | Not Implemented |
TN0674 # 01 Y:2000 | 01 | 2000 | MAKE A NEW BY-PRODUCT | $466,160 | $455,420 | Not Implemented |
TN0674 # 02 Y:2000 | 02 | 2000 | INSTALL EQUIPMENT TO MOVE PRODUCT | $249,860 | $667,440 | Not Implemented |
TN0674 # 03 Y:2000 | 03 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $42,930 | $25,500 | Not Implemented |
TN0674 # 04 Y:2000 | 04 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,490 | $750 | Implemented |
TN0674 # 05 Y:2000 | 05 | 2000 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,380 | $500 | Implemented |
TN0673 # 01 Y:2000 | 01 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,075 | $2,610 | Implemented |
TN0673 # 02 Y:2000 | 02 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $980 | $1,075 | Not Implemented |
TN0673 # 03 Y:2000 | 03 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $715 | $1,820 | Not Implemented |
TN0673 # 04 Y:2000 | 04 | 2000 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $710 | $0 | Not Implemented |
TN0673 # 05 Y:2000 | 05 | 2000 | USE A RAG RECYCLE SERVICE | $240 | $0 | Not Implemented |
TN0673 # 06 Y:2000 | 06 | 2000 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $160 | $0 | Implemented |
TN0672 # 01 Y:2000 | 01 | 2000 | MOVE PRODUCT USING MECHANICAL MEANS | $65,150 | $167,200 | Not Implemented |
TN0672 # 02 Y:2000 | 02 | 2000 | MINIMIZE USE OF RAGS THROUGH WORKER TRAINING | $30,000 | $0 | Not Implemented |
TN0672 # 03 Y:2000 | 03 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $18,266 | $27,000 | Not Implemented |
TN0672 # 04 Y:2000 | 04 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $14,770 | $17,800 | Not Implemented |
TN0672 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,010 | $1,650 | Not Implemented |
TN0672 # 06 Y:2000 | 06 | 2000 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $8,990 | $19,000 | Not Implemented |
TN0672 # 07 Y:2000 | 07 | 2000 | REDUCE OR ELIMINATE WASTE | $8,100 | $3,650 | Not Implemented |
TN0672 # 08 Y:2000 | 08 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,385 | $13,750 | Not Implemented |
TN0672 # 09 Y:2000 | 09 | 2000 | COVER OPEN TANKS | $7,260 | $1,500 | Not Implemented |
TN0672 # 10 Y:2000 | 10 | 2000 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $6,380 | $13,800 | Not Implemented |
TN0672 # 11 Y:2000 | 11 | 2000 | USE SYNTHETIC LUBRICANT | $3,630 | $0 | Not Implemented |
TN0672 # 12 Y:2000 | 12 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,770 | $1,440 | Not Implemented |
TN0672 # 13 Y:2000 | 13 | 2000 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $1,920 | $5,000 | Not Implemented |