Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,856
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0240 # 02 Y:2020 | 02 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $199,826 | $110,000 | Not Implemented |
TT0240 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,129 | $10,004 | Not Implemented |
TT0238 # 01 Y:2020 | 01 | 2020 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $28,385 | $3,500 | Implemented |
TT0238 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,091 | $75,890 | Implemented |
TT0238 # 03 Y:2020 | 03 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,222 | $25,000 | Not Implemented |
TT0238 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,965 | $22,780 | Implemented |
TT0238 # 05 Y:2020 | 05 | 2020 | INCREASE EFFICIENCY OF TRUCKS | $7,291 | $24,565 | Not Implemented |
TT0238 # 06 Y:2020 | 06 | 2020 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,836 | $1,500 | Implemented |
TT0238 # 07 Y:2020 | 07 | 2020 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,527 | $350 | Implemented |
TT0238 # 08 Y:2020 | 08 | 2020 | TURN OFF EQUIPMENT WHEN NOT IN USE | $511 | $40 | Implemented |
TT0236 # 01 Y:2020 | 01 | 2020 | OPTIMIZE PLANT POWER FACTOR | $28,173 | $90,000 | Not Implemented |
TT0236 # 02 Y:2020 | 02 | 2020 | ADOPT IN-HOUSE MATERIAL GENERATION | $28,629 | $16,000 | Implemented |
TT0236 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,250 | $128,083 | Implemented |
TT0236 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,754 | $2,700 | Not Implemented |
TT0236 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,447 | $15,750 | Not Implemented |
TT0236 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,574 | $40 | Not Implemented |
TT0236 # 07 Y:2020 | 07 | 2020 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $1,908 | $500 | Not Implemented |
TT0236 # 08 Y:2020 | 08 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,653 | $2,150 | Not Implemented |
TT0236 # 09 Y:2020 | 09 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $984 | $1,500 | Not Implemented |
TT0236 # 10 Y:2020 | 10 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $206 | $450 | Not Implemented |
TT0233 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $57,084 | $30,000 | Implemented |
TT0233 # 02 Y:2020 | 02 | 2020 | METER WASTE WATER | $52,049 | $2,000 | Implemented |
TT0233 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $43,091 | $147,540 | Implemented |
TT0233 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $12,859 | $20 | Implemented |
TT0233 # 05 Y:2020 | 05 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,206 | $22,392 | Not Implemented |