IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,108

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0726 # 14 Y:2005 14 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,948 $500 Not Implemented
UD0726 # 15 Y:2005 15 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,554 $0 Implemented
UD0726 # 16 Y:2005 16 2005 UPGRADE CONTROLS ON COMPRESSORS $1,253 $0 Implemented
UD0726 # 17 Y:2005 17 2005 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $412 $960 Implemented
UD0725 # 01 Y:2005 01 2005 RECOVER AND REUSE WASTE MATERIAL $45,000 $50,000 Not Implemented
UD0725 # 02 Y:2005 02 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,989 $792 Not Implemented
UD0725 # 03 Y:2005 03 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,863 $28,350 Implemented
UD0725 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,772 $18,444 Implemented
UD0725 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,315 $1,320 Implemented
UD0725 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $4,269 $3,192 Not Implemented
UD0725 # 07 Y:2005 07 2005 OPTIMIZE PLANT POWER FACTOR $3,254 $10,800 Not Implemented
UD0725 # 08 Y:2005 08 2005 INSULATE BARE EQUIPMENT $1,968 $0 Implemented
UD0725 # 09 Y:2005 09 2005 INSTALL OCCUPANCY SENSORS $1,788 $728 Implemented
UD0725 # 10 Y:2005 10 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $632 $1,170 Not Implemented
UD0725 # 11 Y:2005 11 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $564 $296 Not Implemented
UD0722 # 01 Y:2005 01 2005 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $113,700 $454,800 Not Implemented
UD0722 # 02 Y:2005 02 2005 INSTALL OCCUPANCY SENSORS $6,570 $21,200 Not Implemented
UD0722 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,334 $192 Implemented
UD0722 # 04 Y:2005 04 2005 UPGRADE CONTROLS ON COMPRESSORS $2,776 $1,448 Implemented
UD0722 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,734 $9,650 Implemented
UD0722 # 06 Y:2005 06 2005 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,730 $0 Not Implemented
UD0722 # 07 Y:2005 07 2005 INSTALL OCCUPANCY SENSORS $104 $102 Implemented
UD0720 # 01 Y:2005 01 2005 USE MINIMUM STEAM OPERATING PRESSURE $6,931 $0 Not Implemented
UD0720 # 02 Y:2005 02 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,769 $0 Implemented
UD0720 # 03 Y:2005 03 2005 OPTIMIZE PLANT POWER FACTOR $3,870 $6,000 Implemented