Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,108
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0532 # 06 Y:1997 | 06 | 1997 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $6,335 | $5,000 | Implemented |
UD0532 # 07 Y:1997 | 07 | 1997 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $10,100 | $20,000 | Not Implemented |
UD0532 # 08 Y:1997 | 08 | 1997 | $2,508 | $4,880 | Implemented | |
UD0533 # 01 Y:1997 | 01 | 1997 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $508 | $0 | Implemented |
UD0533 # 02 Y:1997 | 02 | 1997 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,468 | $200 | Implemented |
UD0533 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,455 | $2,564 | Implemented |
UD0533 # 04 Y:1997 | 04 | 1997 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $352 | $50 | Implemented |
UD0533 # 05 Y:1997 | 05 | 1997 | UPGRADE CONTROLS ON COMPRESSORS | $553 | $750 | Implemented |
UD0533 # 06 Y:1997 | 06 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,574 | $20,000 | Not Implemented |
UD0533 # 07 Y:1997 | 07 | 1997 | $37,000 | $36,000 | Implemented | |
UD0533 # 08 Y:1997 | 08 | 1997 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $101 | $50 | Implemented |
UD0533 # 09 Y:1997 | 09 | 1997 | MINIMIZE WATER USAGE | $125 | $60 | Not Implemented |
UD0531 # 01 Y:1997 | 01 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,192 | $300 | Implemented |
UD0531 # 02 Y:1997 | 02 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $611 | $2,000 | Implemented |
UD0531 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,444 | $12,327 | Implemented |
UD0530 # 04 Y:1997 | 04 | 1997 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $24,402 | $0 | Implemented |
UD0530 # 05 Y:1997 | 05 | 1997 | $51,015 | $200,000 | Not Implemented | |
UD0530 # 06 Y:1997 | 06 | 1997 | RECOVER WASTE HEAT FROM EQUIPMENT | $32,833 | $66,000 | Not Implemented |
UD0530 # 01 Y:1997 | 01 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $3,055 | $2,200 | Not Implemented |
UD0530 # 02 Y:1997 | 02 | 1997 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $3,250 | $5,600 | Implemented |
UD0530 # 03 Y:1997 | 03 | 1997 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,540 | $37,500 | Not Implemented |
UD0528 # 01 Y:1997 | 01 | 1997 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $4,108 | $0 | Implemented |
UD0528 # 02 Y:1997 | 02 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,857 | $10,000 | Implemented |
UD0528 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,076 | $5,818 | Implemented |
UD0528 # 04 Y:1997 | 04 | 1997 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $2,886 | $200 | Implemented |