Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,039
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0562 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,677 | $1,040 | Implemented |
UD0562 # 05 Y:1999 | 05 | 1999 | FILTER AND REUSE HYDRAULIC OIL | $5,340 | $4,000 | Not Implemented |
UD0562 # 06 Y:1999 | 06 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,976 | $13,500 | Not Implemented |
UD0562 # 07 Y:1999 | 07 | 1999 | RECYCLE CLEANING SOLVENT AND REUSE | $2,344 | $4,000 | Not Implemented |
UD0562 # 08 Y:1999 | 08 | 1999 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $2,041 | $3,000 | Not Implemented |
UD0561 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $100,000 | $200,000 | Not Implemented |
UD0561 # 02 Y:1999 | 02 | 1999 | USE POWER DURING OFF-PEAK PERIODS | $12,265 | $5,000 | Not Implemented |
UD0561 # 03 Y:1999 | 03 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,566 | $8,140 | Implemented |
UD0561 # 04 Y:1999 | 04 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,418 | $14,216 | Implemented |
UD0561 # 05 Y:1999 | 05 | 1999 | UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID | $1,139 | $3,000 | Not Implemented |
UD0561 # 06 Y:1999 | 06 | 1999 | RECYCLE WASTE INK AND CLEANUP SOLVENT | $942 | $3,000 | Not Implemented |
UD0561 # 07 Y:1999 | 07 | 1999 | ADD AREA LIGHTING SWITCHES | $877 | $0 | Not Implemented |
UD0560 # 01 Y:1999 | 01 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $880,000 | $2,100,000 | Not Implemented |
UD0560 # 02 Y:1999 | 02 | 1999 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $31,250 | $0 | Implemented |
UD0560 # 03 Y:1999 | 03 | 1999 | CHANGE OPERATING CONDITIONS | $15,400 | $20,000 | Not Implemented |
UD0560 # 04 Y:1999 | 04 | 1999 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,825 | $860 | Not Implemented |
UD0560 # 05 Y:1999 | 05 | 1999 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $4,300 | $0 | Implemented |
UD0560 # 06 Y:1999 | 06 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,148 | $4,420 | Implemented |
UD0560 # 07 Y:1999 | 07 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,789 | $330 | Implemented |
UD0560 # 08 Y:1999 | 08 | 1999 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,081 | $0 | Implemented |
UD0560 # 09 Y:1999 | 09 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $784 | $1,060 | Implemented |
UD0560 # 10 Y:1999 | 10 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $563 | $380 | Implemented |
UD0560 # 11 Y:1999 | 11 | 1999 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $494 | $0 | Implemented |
UD0559 # 01 Y:1998 | 01 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $18,360 | $25,000 | Not Implemented |
UD0559 # 02 Y:1998 | 02 | 1998 | EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME | $13,770 | $5,000 | Implemented |