Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,868
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0626 # 03 Y:2024 | 03 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,328 | $1,140 | n/a |
UF0626 # 05 Y:2024 | 05 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,655 | $12,290 | n/a |
UF0626 # 11 Y:2024 | 11 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $25,597 | $60,000 | n/a |
UF0626 # 09 Y:2024 | 09 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $75,600 | $740 | n/a |
UF0626 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,871 | $0 | n/a |
UF0626 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,036 | $15,920 | n/a |
UF0625 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $51,273 | $322,608 | n/a |
UF0625 # 07 Y:2024 | 07 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $710 | $0 | n/a |
UF0625 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,440 | $6,188 | n/a |
UF0625 # 03 Y:2024 | 03 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,895 | $5,801 | n/a |
UF0625 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,082 | $469 | n/a |
UF0625 # 10 Y:2024 | 10 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $9,256 | $2,512 | n/a |
UF0625 # 06 Y:2024 | 06 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,573 | $3,962 | n/a |
UF0625 # 08 Y:2024 | 08 | 2024 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $68,287 | $300,000 | n/a |
UF0625 # 09 Y:2024 | 09 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $31,920 | $804 | n/a |
UF0625 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $33,462 | $12,390 | n/a |
UF0624 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,280 | $0 | n/a |
UF0624 # 02 Y:2024 | 02 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $20,908 | $14,359 | n/a |
UF0624 # 06 Y:2024 | 06 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $5,844 | $6,000 | n/a |
UF0624 # 08 Y:2024 | 08 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $23,221 | $60,000 | n/a |
UF0624 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,033 | $25,340 | n/a |
UF0624 # 07 Y:2024 | 07 | 2024 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $38,400 | $100,000 | n/a |
UF0624 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $59,131 | $322,608 | n/a |
UF0624 # 03 Y:2024 | 03 | 2024 | USE BATTERY STORAGE FOR DEMAND CONTROL | $11,217 | $21,658 | n/a |
UF0623 # 04 Y:2024 | 04 | 2024 | INSTALL DE-AERATOR IN PLACE OF CONDENSATE TANK | $2,627 | $2,343 | n/a |