Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,715
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0534 # 02 Y:2019 | 02 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $8,685 | $27,820 | Not Implemented |
UF0534 # 03 Y:2019 | 03 | 2019 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $8,399 | $570 | Not Implemented |
UF0534 # 04 Y:2019 | 04 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,018 | $0 | Not Implemented |
UF0534 # 05 Y:2019 | 05 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,000 | $18,400 | Not Implemented |
UF0533 # 01 Y:2019 | 01 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $53,828 | $109,400 | Implemented |
UF0533 # 02 Y:2019 | 02 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $42,877 | $213,770 | Implemented |
UF0533 # 03 Y:2019 | 03 | 2019 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $20,145 | $54,910 | Implemented |
UF0533 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,617 | $472 | Implemented |
UF0533 # 05 Y:2019 | 05 | 2019 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $1,160 | $4,000 | Implemented |
UF0533 # 06 Y:2019 | 06 | 2019 | RECOVER AND REUSE WASTE MATERIAL | $396,790 | $810,000 | Implemented |
UF0532 # 01 Y:2019 | 01 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $40,174 | $25,000 | Implemented |
UF0532 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $23,919 | $1,400 | Implemented |
UF0532 # 03 Y:2019 | 03 | 2019 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $9,352 | $25,847 | Implemented |
UF0532 # 04 Y:2019 | 04 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,403 | $5,998 | Not Implemented |
UF0532 # 05 Y:2019 | 05 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,301 | $421 | Implemented |
UF0532 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $1,094 | $230 | Not Implemented |
UF0532 # 07 Y:2019 | 07 | 2019 | REDUCE OR ELIMINATE WASTE | $19,196 | $40,500 | Implemented |
UF0531 # 01 Y:2019 | 01 | 2019 | REPLACE HIGH RESISTANCE DUCTS, PIPES, AND FITTINGS | $19,490 | $2,150 | Implemented |
UF0531 # 02 Y:2019 | 02 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $18,581 | $89,000 | Implemented |
UF0531 # 03 Y:2019 | 03 | 2019 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $17,787 | $43,500 | Implemented |
UF0531 # 04 Y:2019 | 04 | 2019 | INSTALL OCCUPANCY SENSORS | $2,473 | $7,866 | Implemented |
UF0531 # 05 Y:2019 | 05 | 2019 | INSULATE BARE EQUIPMENT | $2,072 | $195 | Implemented |
UF0531 # 06 Y:2019 | 06 | 2019 | UPGRADE CONTROLS ON COMPRESSORS | $1,675 | $667 | Implemented |
UF0530 # 03 Y:2019 | 03 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $47,739 | $25,000 | Implemented |
UF0530 # 04 Y:2019 | 04 | 2019 | RECOVER WASTE HEAT FROM EQUIPMENT | $43,693 | $25,000 | Implemented |