Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,819
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0614 # 13 Y:2024 | 13 | 2024 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $27,969 | $60,000 | n/a |
UF0614 # 12 Y:2024 | 12 | 2024 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $10,444 | $4,280 | n/a |
UF0614 # 11 Y:2024 | 11 | 2024 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,889 | $8,355 | n/a |
UF0614 # 10 Y:2024 | 10 | 2024 | ADJUST VENTS TO MINIMIZE ENERGY USE | $2,337 | $1,797 | n/a |
UF0614 # 09 Y:2024 | 09 | 2024 | UPGRADE CONVEYORS | $3,290 | $8,838 | n/a |
UF0618 # 07 Y:2024 | 07 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $10,000 | $1,931 | n/a |
UF0618 # 06 Y:2024 | 06 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,621 | $12,380 | n/a |
UF0618 # 05 Y:2024 | 05 | 2024 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $150,000 | $70,000 | n/a |
UF0618 # 04 Y:2024 | 04 | 2024 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $308,175 | $14,388 | n/a |
UF0618 # 03 Y:2024 | 03 | 2024 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,409 | $5,855 | n/a |
UF0618 # 02 Y:2024 | 02 | 2024 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $1,789 | $872 | n/a |
UF0618 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $19,157 | $112,913 | n/a |
UF0617 # 08 Y:2024 | 08 | 2024 | IMPROVE SPACE COMFORT CONDITIONING | $904 | $1,752 | n/a |
UF0617 # 07 Y:2024 | 07 | 2024 | AUTOMATE FINISHING PROCESS | $74,880 | $100,000 | n/a |
UF0617 # 06 Y:2024 | 06 | 2024 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $890,327 | $117,000 | n/a |
UF0617 # 05 Y:2024 | 05 | 2024 | REDUCE GLAZED AREAS IN BUILDINGS | $1,046 | $1,720 | n/a |
UF0617 # 04 Y:2024 | 04 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,230 | $5,280 | n/a |
UF0617 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $10,599 | $49,000 | n/a |
UF0617 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $13,015 | $12,416 | n/a |
UF0617 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $83,700 | $322,608 | n/a |
UF0616 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,749 | $327 | n/a |
UF0616 # 02 Y:2024 | 02 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $21,638 | $12,552 | n/a |
UF0616 # 04 Y:2024 | 04 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $5,125 | $25,440 | n/a |
UF0616 # 03 Y:2024 | 03 | 2024 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $7,571 | $5,849 | n/a |
UF0616 # 06 Y:2024 | 06 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,368 | $202 | n/a |