Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
278
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0315 # 07 Y:2006 | 07 | 2006 | ADD AREA LIGHTING SWITCHES | $1,294 | $1,100 | Not Implemented |
UM0310 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,854 | $225 | Implemented |
UM0310 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,785 | $5,996 | Implemented |
UM0310 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,694 | $2,000 | Not Implemented |
UM0310 # 04 Y:2006 | 04 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $10,978 | $375 | Implemented |
UM0310 # 03 Y:2006 | 03 | 2006 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,000 | $14,850 | Implemented |
UM0310 # 02 Y:2006 | 02 | 2006 | INSTALL SOLID WASTE INCINERATOR FOR HEAT | $30,322 | $27,325 | Not Implemented |
UM0310 # 01 Y:2006 | 01 | 2006 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $31,460 | $21,337 | Not Implemented |
UM0308 # 02 Y:2006 | 02 | 2006 | REDUCE VENTILATION AIR | $2,507 | $500 | Implemented |
UM0308 # 01 Y:2006 | 01 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $3,769 | $500 | Implemented |
UM0308 # 03 Y:2006 | 03 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,070 | $1,250 | Not Implemented |
UM0308 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,462 | $3,479 | Not Implemented |
UM0308 # 06 Y:2006 | 06 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $392 | $1,000 | Implemented |
UM0308 # 07 Y:2006 | 07 | 2006 | INSULATE BARE EQUIPMENT | $142 | $310 | Not Implemented |
UM0308 # 05 Y:2006 | 05 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $536 | $300 | Implemented |
UM0305 # 07 Y:2006 | 07 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $2,689 | $4,660 | Implemented |
UM0305 # 01 Y:2006 | 01 | 2006 | INSULATE BARE EQUIPMENT | $26,404 | $1,300 | Implemented |
UM0305 # 02 Y:2006 | 02 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,149 | $46,400 | Not Implemented |
UM0305 # 03 Y:2006 | 03 | 2006 | INSULATE BARE EQUIPMENT | $17,877 | $1,112 | Implemented |
UM0305 # 04 Y:2006 | 04 | 2006 | USE OPTIMUM THICKNESS INSULATION | $16,577 | $47,224 | Not Implemented |
UM0305 # 05 Y:2006 | 05 | 2006 | USE OPTIMUM THICKNESS INSULATION | $12,021 | $4,834 | Implemented |
UM0305 # 08 Y:2006 | 08 | 2006 | INSULATE BARE EQUIPMENT | $2,049 | $1,300 | Not Implemented |
UM0305 # 11 Y:2006 | 11 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $160 | $200 | Not Implemented |
UM0305 # 10 Y:2006 | 10 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $527 | $2,145 | Not Implemented |
UM0305 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,329 | $4,720 | Implemented |