IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

278

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0287 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,506 $675 Implemented
UM0287 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $17,467 $1,200 Implemented
UM0287 # 04 Y:2005 04 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,493 $8,770 Implemented
UM0287 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,726 $13,103 Implemented
UM0287 # 06 Y:2005 06 2005 INSULATE BARE EQUIPMENT $6,622 $206 Not Implemented
UM0287 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,116 $1,000 Implemented
UM0287 # 08 Y:2005 08 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,334 $1,250 Implemented
UM0280 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,334 $24,499 Not Implemented
UM0280 # 02 Y:2005 02 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $18,174 $11,550 Not Implemented
UM0280 # 03 Y:2005 03 2005 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,277 $35 Implemented
UM0280 # 04 Y:2005 04 2005 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $2,274 $1,680 Not Implemented
UM0280 # 05 Y:2005 05 2005 INSULATE BARE EQUIPMENT $2,086 $128 Implemented
UM0280 # 06 Y:2005 06 2005 INSTALL OCCUPANCY SENSORS $1,470 $484 Implemented
UM0280 # 07 Y:2005 07 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $897 $750 Implemented
UM0280 # 08 Y:2005 08 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $654 $225 Implemented
UM0280 # 09 Y:2005 09 2005 RECOVER WASTE HEAT FROM EQUIPMENT $397 $1,000 Not Implemented
UM0280 # 10 Y:2005 10 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $208 $105 Not Implemented
UM0274 # 01 Y:2005 01 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $42,936 $135,000 Not Implemented
UM0274 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $5,622 $2,000 Not Implemented
UM0274 # 03 Y:2005 03 2005 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,242 $0 Implemented
UM0274 # 04 Y:2005 04 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,966 $200 Not Implemented
UM0274 # 05 Y:2005 05 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,699 $700 Not Implemented
UM0274 # 06 Y:2005 06 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $791 $2,000 Not Implemented
UM0272 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,828 $1,000 Implemented
UM0272 # 02 Y:2005 02 2005 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,313 $3,000 Not Implemented