IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,094

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0455 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,635 $2,000 Not Implemented
UM0455 # 02 Y:2015 02 2015 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $8,778 $0 Not Implemented
UM0455 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,898 $500 Implemented
UM0455 # 04 Y:2015 04 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,274 $7,300 Implemented
UM0455 # 05 Y:2015 05 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,338 $2,500 Implemented
UM0455 # 06 Y:2015 06 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,725 $25,000 Not Implemented
UM0454 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,028 $2,000 Not Implemented
UM0454 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,291 $14,700 Not Implemented
UM0454 # 03 Y:2015 03 2015 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $2,130 $1,710 Implemented
UM0454 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM $13,892 $4,500 Not Implemented
UM0454 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $1,354 $1,000 Not Implemented
UM0453 # 01 Y:2015 01 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,380 $5,000 Not Implemented
UM0453 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,831 $1,000 Implemented
UM0453 # 03 Y:2015 03 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,442 $1,500 Implemented
UM0453 # 04 Y:2015 04 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,115 $5,400 Not Implemented
UM0453 # 05 Y:2015 05 2015 RECOVER WASTE HEAT FROM EQUIPMENT $7,852 $4,000 Implemented
UM0452 # 01 Y:2015 01 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,871 $1,000 Not Implemented
UM0452 # 02 Y:2015 02 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,393 $2,500 Implemented
UM0452 # 03 Y:2015 03 2015 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $28,779 $28,000 Implemented
UM0452 # 04 Y:2015 04 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,903 $4,000 Implemented
UM0451 # 01 Y:2014 01 2014 OPTIMIZE PLANT POWER FACTOR $16,165 $25,000 Implemented
UM0451 # 02 Y:2014 02 2014 INSTALL OCCUPANCY SENSORS $6,320 $4,800 Implemented
UM0451 # 03 Y:2014 03 2014 REVISE SMOKE CLEANUP FROM OPERATIONS $79,670 $60,000 Not Implemented
UM0451 # 04 Y:2014 04 2014 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,930 $6,000 Not Implemented
UM0450 # 01 Y:2014 01 2014 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $58,763 $200,000 Not Implemented