Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,732
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0184 # 05 Y:2001 | 05 | 2001 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $56,800 | $75,000 | Implemented |
UM0184 # 06 Y:2001 | 06 | 2001 | CHANGE OPERATING CONDITIONS | $6,800 | $11,000 | Not Implemented |
UM0186 # 01 Y:2001 | 01 | 2001 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $21,500 | $4,100 | n/a |
UM0186 # 02 Y:2001 | 02 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,000 | $3,500 | n/a |
UM0186 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $7,700 | $700 | n/a |
UM0186 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,100 | $500 | n/a |
UM0186 # 05 Y:2001 | 05 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,000 | $300 | n/a |
UM0186 # 06 Y:2001 | 06 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,000 | $700 | n/a |
UM0186 # 07 Y:2001 | 07 | 2001 | OPTIMIZE PLANT POWER FACTOR | $1,500 | $2,300 | n/a |
UM0186 # 08 Y:2001 | 08 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $500 | $1,000 | n/a |
UM0182 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $568 | $375 | Implemented |
UM0182 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $361 | $1,000 | Not Implemented |
UM0182 # 03 Y:2001 | 03 | 2001 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $57,900 | $28,900 | Implemented |
UM0182 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $43,000 | $100,000 | Not Implemented |
UM0181 # 01 Y:2001 | 01 | 2001 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $300 | $300 | Not Implemented |
UM0181 # 02 Y:2001 | 02 | 2001 | USE OPTIMUM THICKNESS INSULATION | $3,470 | $3,540 | Not Implemented |
UM0181 # 03 Y:2001 | 03 | 2001 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $94,100 | $71,000 | Not Implemented |
UM0181 # 04 Y:2001 | 04 | 2001 | IMPROVE SPACE COMFORT CONDITIONING | $4,520 | $8,000 | Not Implemented |
UM0180 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,540 | $750 | Implemented |
UM0180 # 02 Y:2001 | 02 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,120 | $2,100 | Implemented |
UM0180 # 03 Y:2001 | 03 | 2001 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,580 | $950 | Implemented |
UM0180 # 04 Y:2001 | 04 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $54,000 | $16,000 | Implemented |
UM0179 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,864 | $450 | Implemented |
UM0179 # 02 Y:2001 | 02 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $994 | $1,250 | Not Implemented |
UM0179 # 03 Y:2001 | 03 | 2001 | USE OPTIMUM THICKNESS INSULATION | $4,406 | $2,264 | Not Implemented |