IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,094

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0224 # 09 Y:2003 09 2003 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,650 $120 Implemented
UM0224 # 10 Y:2003 10 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $53,338 $12,600 Not Implemented
UM0224 # 11 Y:2003 11 2003 USE DEMAND CONTROLLER OR LOAD SHEDDER $17,270 $10,000 Not Implemented
UM0224 # 12 Y:2003 12 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $31,000 $2,500 Implemented
UM0223 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,160 $500 Implemented
UM0223 # 02 Y:2003 02 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,344 $958 Implemented
UM0223 # 03 Y:2003 03 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,704 $5,850 Not Implemented
UM0223 # 04 Y:2003 04 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,898 $3,150 Not Implemented
UM0223 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,530 $3,000 Implemented
UM0223 # 06 Y:2003 06 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $37,000 $9,500 Implemented
UM0223 # 07 Y:2003 07 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $7,160 $1,250 Implemented
UM0222 # 01 Y:2002 01 2002 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $28,900 $10,000 Implemented
UM0222 # 02 Y:2002 02 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $23,074 $1,750 Implemented
UM0222 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,900 $1,275 Implemented
UM0222 # 04 Y:2002 04 2002 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,523 $2,000 Not Implemented
UM0222 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,261 $4,000 Not Implemented
UM0221 # 01 Y:2002 01 2002 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $40,400 $4,000 Implemented
UM0221 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,486 $7,425 Implemented
UM0221 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $8,720 $2,000 Not Implemented
UM0221 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $8,700 $1,250 Implemented
UM0221 # 05 Y:2002 05 2002 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,750 $12,870 Not Implemented
UM0221 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,580 $42,883 Not Implemented
UM0221 # 07 Y:2002 07 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,650 $2,000 Not Implemented
UM0221 # 08 Y:2002 08 2002 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $4,075 $3,000 Not Implemented
UM0221 # 09 Y:2002 09 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,340 $8,500 Not Implemented