Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,732
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0167 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,700 | $4,550 | Not Implemented |
UM0167 # 06 Y:2000 | 06 | 2000 | INSULATE BARE EQUIPMENT | $6,118 | $3,300 | Not Implemented |
UM0167 # 07 Y:2000 | 07 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $16,497 | $1,000 | Not Implemented |
UM0167 # 08 Y:2000 | 08 | 2000 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $7,288 | $11,000 | Not Implemented |
UM0166 # 01 Y:2000 | 01 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $244 | $400 | Not Implemented |
UM0166 # 02 Y:2000 | 02 | 2000 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,683 | $1,700 | Not Implemented |
UM0166 # 03 Y:2000 | 03 | 2000 | USE RADIANT HEATER FOR SPOT HEATING | $2,815 | $10,000 | Not Implemented |
UM0166 # 04 Y:2000 | 04 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,595 | $11,900 | Not Implemented |
UM0166 # 05 Y:2000 | 05 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $562 | $3,120 | Not Implemented |
UM0166 # 06 Y:2000 | 06 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,705 | $5,925 | Implemented |
UM0165 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,237 | $9,748 | Implemented |
UM0165 # 02 Y:2000 | 02 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,860 | $0 | Implemented |
UM0165 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,996 | $1,750 | Implemented |
UM0165 # 04 Y:2000 | 04 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,852 | $13,583 | Not Implemented |
UM0165 # 05 Y:2000 | 05 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $26,506 | $131,000 | Not Implemented |
UM0165 # 06 Y:2000 | 06 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $658 | $750 | Not Implemented |
UM0165 # 07 Y:2000 | 07 | 2000 | FILTER AND REUSE HYDRAULIC OIL | $37,145 | $10,500 | Not Implemented |
UM0164 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,316 | $500 | Not Implemented |
UM0164 # 02 Y:2000 | 02 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,563 | $50 | Not Implemented |
UM0164 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,733 | $600 | Not Implemented |
UM0164 # 04 Y:2000 | 04 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $225 | $750 | Not Implemented |
UM0164 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,353 | $7,000 | Not Implemented |
UM0164 # 06 Y:2000 | 06 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,328 | $2,500 | Not Implemented |
UM0164 # 07 Y:2000 | 07 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $30,000 | $5,000 | Implemented |
UM0164 # 08 Y:2000 | 08 | 2000 | RECOVER AND REUSE COOLING WATER | $21,600 | $5,000 | Not Implemented |