Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,094
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0172 # 06 Y:2000 | 06 | 2000 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $4,000 | $250 | Implemented |
UM0172 # 07 Y:2000 | 07 | 2000 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,500 | $3,000 | Not Implemented |
UM0171 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $717 | $3,440 | Not Implemented |
UM0171 # 02 Y:2000 | 02 | 2000 | USE WASTE HEAT STEAM FOR ABSORPTION REFRIGERATION | $15,476 | $30,000 | Not Implemented |
UM0171 # 03 Y:2000 | 03 | 2000 | REDUCE EXCESSIVE BOILER BLOWDOWN | $2,065 | $4,430 | Not Implemented |
UM0171 # 04 Y:2000 | 04 | 2000 | USE OTHER WASTE CONCENTRATION METHODS | $147,018 | $250,000 | Not Implemented |
UM0171 # 05 Y:2000 | 05 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $32,105 | $3,600 | Not Implemented |
UM0171 # 06 Y:2000 | 06 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $187,954 | $165,000 | Implemented |
UM0170 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $709 | $1,660 | Implemented |
UM0170 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,147 | $500 | Implemented |
UM0170 # 03 Y:2000 | 03 | 2000 | USE WASTE HEAT FROM HOT FLUE GASES TO GENERATE STEAM | $185,532 | $310,000 | Not Implemented |
UM0170 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $64,245 | $22,000 | Not Implemented |
UM0170 # 05 Y:2000 | 05 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $11,573 | $8,200 | Not Implemented |
UM0169 # 01 Y:2000 | 01 | 2000 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $15,444 | $2,250 | Implemented |
UM0169 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $1,322 | $800 | Implemented |
UM0169 # 03 Y:2000 | 03 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $27,956 | $8,250 | Not Implemented |
UM0169 # 04 Y:2000 | 04 | 2000 | INSULATE BARE EQUIPMENT | $13,069 | $23,100 | Not Implemented |
UM0169 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,117 | $500 | Implemented |
UM0169 # 06 Y:2000 | 06 | 2000 | USE RADIANT HEATER FOR SPOT HEATING | $8,102 | $10,000 | Implemented |
UM0169 # 07 Y:2000 | 07 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $6,084 | $350 | Not Implemented |
UM0169 # 08 Y:2000 | 08 | 2000 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $50,433 | $23,500 | Implemented |
UM0169 # 09 Y:2000 | 09 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $312,500 | $860,000 | Not Implemented |
UM0168 # 01 Y:2000 | 01 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $526 | $993 | Implemented |
UM0168 # 02 Y:2000 | 02 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $15,117 | $50,000 | Not Implemented |
UM0168 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,945 | $2,250 | Implemented |