IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,094

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0164 # 02 Y:2000 02 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,563 $50 Not Implemented
UM0164 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,733 $600 Not Implemented
UM0164 # 04 Y:2000 04 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $225 $750 Not Implemented
UM0164 # 05 Y:2000 05 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,353 $7,000 Not Implemented
UM0164 # 06 Y:2000 06 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,328 $2,500 Not Implemented
UM0164 # 07 Y:2000 07 2000 RECOVER AND REUSE WASTE MATERIAL $30,000 $5,000 Implemented
UM0164 # 08 Y:2000 08 2000 RECOVER AND REUSE COOLING WATER $21,600 $5,000 Not Implemented
UM0163 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,712 $84,426 Not Implemented
UM0163 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,248 $0 Implemented
UM0163 # 03 Y:2000 03 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,496 $500 Implemented
UM0163 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,147 $300 Implemented
UM0163 # 05 Y:2000 05 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,922 $1,500 Not Implemented
UM0163 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $2,100 $200 Not Implemented
UM0163 # 07 Y:2000 07 2000 INSULATE BARE EQUIPMENT $10,078 $10,000 Not Implemented
UM0163 # 08 Y:2000 08 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $14,512 $60,000 Not Implemented
UM0163 # 09 Y:2000 09 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,997 $90,000 Implemented
UM0162 # 01 Y:2000 01 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,699 $50 Not Implemented
UM0162 # 02 Y:2000 02 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,362 $10,000 Implemented
UM0162 # 03 Y:2000 03 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $3,628 $10,800 Implemented
UM0162 # 04 Y:2000 04 2000 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $15,894 $12,000 Implemented
UM0162 # 05 Y:2000 05 2000 INSTALL AUTOMATIC STACK DAMPER $576 $720 Implemented
UM0162 # 06 Y:2000 06 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $18,858 $36,000 Implemented
UM0162 # 07 Y:2000 07 2000 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $12,510 $24,650 Implemented
UM0161 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,365 $450 Implemented
UM0161 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,614 $500 Not Implemented