Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,094
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0157 # 03 Y:2000 | 03 | 2000 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,224 | $4,430 | Implemented |
UM0157 # 04 Y:2000 | 04 | 2000 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $8,000 | $400 | Not Implemented |
UM0157 # 05 Y:2000 | 05 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,296 | $738 | Implemented |
UM0156 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $428 | $500 | Implemented |
UM0156 # 02 Y:2000 | 02 | 2000 | DISCONNECT BALLASTS | $1,786 | $0 | Implemented |
UM0156 # 03 Y:2000 | 03 | 2000 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,860 | $48,600 | Not Implemented |
UM0156 # 04 Y:2000 | 04 | 2000 | REDUCE EXCESSIVE BOILER BLOWDOWN | $1,813 | $4,430 | Not Implemented |
UM0156 # 05 Y:2000 | 05 | 2000 | REPAIR OR REPLACE STEAM TRAPS | $9,420 | $880 | Implemented |
UM0156 # 06 Y:2000 | 06 | 2000 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $7,640 | $6,500 | Implemented |
UM0156 # 07 Y:2000 | 07 | 2000 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $19,310 | $7,000 | Not Implemented |
UM0156 # 08 Y:2000 | 08 | 2000 | CHANGE OPERATING CONDITIONS | $38,942 | $20,000 | Not Implemented |
UM0155 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $575 | $500 | Implemented |
UM0155 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,279 | $300 | Implemented |
UM0155 # 03 Y:2000 | 03 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $664 | $309 | Implemented |
UM0155 # 04 Y:2000 | 04 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $5,751 | $18,000 | Not Implemented |
UM0155 # 05 Y:2000 | 05 | 2000 | RECOVER AND REUSE COOLING WATER | $31,455 | $21,257 | Implemented |
UM0154 # 01 Y:2000 | 01 | 2000 | DISCONNECT BALLASTS | $2,608 | $880 | Implemented |
UM0154 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $732 | $1,400 | Not Implemented |
UM0154 # 03 Y:2000 | 03 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,312 | $25,370 | Not Implemented |
UM0154 # 04 Y:2000 | 04 | 2000 | REDUCE VENTILATION AIR | $18,794 | $0 | Implemented |
UM0154 # 05 Y:2000 | 05 | 2000 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $9,360 | $0 | Implemented |
UM0154 # 06 Y:2000 | 06 | 2000 | ADD ADDITIONAL PRODUCTION SHIFT | $1,980,000 | $568,714 | Not Implemented |
UM0153 # 01 Y:2000 | 01 | 2000 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,796 | $2,000 | Not Implemented |
UM0153 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,023 | $800 | Not Implemented |
UM0153 # 03 Y:2000 | 03 | 2000 | REUSE SCRAP GLASS AS FEED STOCK | $7,831 | $0 | Not Implemented |