Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
278
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0150 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,067 | $880 | Not Implemented |
UM0150 # 04 Y:1999 | 04 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,923 | $1,750 | Not Implemented |
UM0150 # 05 Y:1999 | 05 | 1999 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $35,216 | $50,000 | Not Implemented |
UM0149 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $836 | $500 | Implemented |
UM0149 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $618 | $200 | Implemented |
UM0149 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,322 | $1,500 | Not Implemented |
UM0149 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,107 | $10,500 | Not Implemented |
UM0149 # 05 Y:1999 | 05 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,804 | $0 | Not Implemented |
UM0149 # 06 Y:1999 | 06 | 1999 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $8,500 | $40,000 | Implemented |
UM0149 # 07 Y:1999 | 07 | 1999 | EXPAND OPERATIONS INTO UNUSED SPACE | $357,000 | $714,000 | Not Implemented |
UM0147 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,038 | $3,557 | Not Implemented |
UM0147 # 02 Y:1999 | 02 | 1999 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,796 | $2,000 | Not Implemented |
UM0147 # 03 Y:1999 | 03 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $19,748 | $500 | Not Implemented |
UM0147 # 04 Y:1999 | 04 | 1999 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $7,215 | $10,000 | Not Implemented |
UM0147 # 05 Y:1999 | 05 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $1,436 | $0 | Implemented |
UM0147 # 06 Y:1999 | 06 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $990 | $400 | Not Implemented |
UM0132 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,280 | $7,301 | Implemented |
UM0132 # 02 Y:1999 | 02 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $680 | $700 | Implemented |
UM0132 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $667 | $300 | Implemented |
UM0132 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $349 | $1,000 | Implemented |
UM0132 # 05 Y:1999 | 05 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $815 | $990 | Implemented |
UM0132 # 06 Y:1999 | 06 | 1999 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $13,503 | $3,700 | Implemented |
UM0132 # 07 Y:1999 | 07 | 1999 | USE LOW VOC OR WATER BASED PAINT | $5,439 | $500 | Implemented |
UM0132 # 08 Y:1999 | 08 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $53,333 | $1,548 | Not Implemented |
UM0128 # 01 Y:1999 | 01 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,071 | $1,700 | Not Implemented |