IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,094

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0129 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,707 $23,612 Not Implemented
UM0129 # 03 Y:1999 03 1999 REPLACE BOILER $78,528 $13,800 Not Implemented
UM0129 # 04 Y:1999 04 1999 RECOVER WASTE HEAT FROM EQUIPMENT $24,159 $17,000 Not Implemented
UM0129 # 05 Y:1999 05 1999 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $56,391 $122,400 Not Implemented
UM0129 # 06 Y:1999 06 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $3,463 $19,860 Not Implemented
UM0128 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,071 $1,700 Not Implemented
UM0128 # 02 Y:1999 02 1999 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $885 $2,000 Not Implemented
UM0128 # 03 Y:1999 03 1999 INSTALL OCCUPANCY SENSORS $2,650 $1,000 Not Implemented
UM0128 # 04 Y:1999 04 1999 REUSE / RECYCLE/ SELL PAPER PRODUCTS $1,800 $0 Not Implemented
UM0128 # 05 Y:1999 05 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $13,800 $0 Not Implemented
UM0128 # 06 Y:1999 06 1999 INSTALL AUTOMATIC PACKING EQUIPMENT $47,700 $20,000 Not Implemented
UM0128 # 07 Y:1999 07 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $16,635 $450 Not Implemented
UM0127 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,907 $5,428 Not Implemented
UM0127 # 02 Y:1999 02 1999 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,282 $250 Not Implemented
UM0127 # 03 Y:1999 03 1999 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,496 $5,000 Not Implemented
UM0127 # 04 Y:1999 04 1999 USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS $30,552 $35,000 Not Implemented
UM0127 # 05 Y:1999 05 1999 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $12,705 $13,600 Not Implemented
UM0126 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,401 $25,843 Implemented
UM0126 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,221 $938 Not Implemented
UM0126 # 03 Y:1998 03 1998 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,053 $5,250 Implemented
UM0126 # 04 Y:1998 04 1998 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $24,729 $250 Not Implemented
UM0126 # 05 Y:1998 05 1998 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $21,553 $80,000 Not Implemented
UM0126 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $862 $1,000 Implemented
UM0126 # 07 Y:1998 07 1998 RECOVER WASTE HEAT FROM EQUIPMENT $9,603 $2,000 Implemented
UM0126 # 08 Y:1998 08 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,264 $1,800 Implemented