Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
154
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0100 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,265 | $28,912 | Implemented |
UM0100 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,676 | $2,400 | Implemented |
UM0100 # 05 Y:1997 | 05 | 1997 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $40,519 | $38 | Not Implemented |
UM0100 # 02 Y:1997 | 02 | 1997 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $378 | $0 | Not Implemented |
UM0100 # 04 Y:1997 | 04 | 1997 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,306 | $16,063 | Not Implemented |
UM0099 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,644 | $12,823 | Not Implemented |
UM0099 # 02 Y:1997 | 02 | 1997 | INSTALL OCCUPANCY SENSORS | $194 | $200 | Not Implemented |
UM0099 # 05 Y:1997 | 05 | 1997 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $31,291 | $0 | Not Implemented |
UM0099 # 03 Y:1997 | 03 | 1997 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $5,407 | $4,500 | Not Implemented |
UM0099 # 04 Y:1997 | 04 | 1997 | USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS | $3,527 | $6,000 | Not Implemented |
UM0098 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,225 | $10,986 | Not Implemented |
UM0098 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $364 | $5,910 | Implemented |
UM0098 # 04 Y:1997 | 04 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,222 | $700 | Implemented |
UM0098 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $939 | $480 | Implemented |
UM0098 # 05 Y:1997 | 05 | 1997 | MAINTAIN CLEAN CONDITIONS BEFORE PAINTING | $23,453 | $15,000 | Not Implemented |
UM0097 # 05 Y:1997 | 05 | 1997 | INSTALL AUTOMATIC PACKING EQUIPMENT | $187,572 | $28,169 | Implemented |
UM0097 # 04 Y:1997 | 04 | 1997 | MINIMIZE WATER USAGE | $915 | $0 | Not Implemented |
UM0097 # 02 Y:1997 | 02 | 1997 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,340 | $1,500 | Implemented |
UM0097 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,449 | $4,445 | Implemented |
UM0097 # 03 Y:1997 | 03 | 1997 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $4,254 | $2,400 | Not Implemented |
UM0096 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,896 | $1,000 | Implemented |
UM0096 # 05 Y:1997 | 05 | 1997 | MOVE PRODUCT USING MECHANICAL MEANS | $640 | $4,500 | Implemented |
UM0096 # 01 Y:1997 | 01 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,791 | $2,165 | Implemented |
UM0096 # 04 Y:1997 | 04 | 1997 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $30,459 | $1,000 | Implemented |
UM0096 # 02 Y:1997 | 02 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,478 | $9,846 | Not Implemented |