Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
170
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0126 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,221 | $938 | Not Implemented |
UM0126 # 07 Y:1998 | 07 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,603 | $2,000 | Implemented |
UM0126 # 08 Y:1998 | 08 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,264 | $1,800 | Implemented |
UM0126 # 11 Y:1998 | 11 | 1998 | CLEAR AND RENT EXISTING SPACE | $151,198 | $5,000 | Not Implemented |
UM0126 # 04 Y:1998 | 04 | 1998 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $24,729 | $250 | Not Implemented |
UM0126 # 09 Y:1998 | 09 | 1998 | RECOVER AND REUSE COOLING WATER | $6,202 | $4,500 | Implemented |
UM0126 # 05 Y:1998 | 05 | 1998 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $21,553 | $80,000 | Not Implemented |
UM0126 # 01 Y:1998 | 01 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,401 | $25,843 | Implemented |
UM0126 # 10 Y:1998 | 10 | 1998 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $200,000 | $0 | Implemented |
UM0126 # 03 Y:1998 | 03 | 1998 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $20,053 | $5,250 | Implemented |
UM0126 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $862 | $1,000 | Implemented |
UM0125 # 03 Y:1998 | 03 | 1998 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $89,497 | $25,000 | Implemented |
UM0125 # 02 Y:1998 | 02 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $47,135 | $3,000 | Implemented |
UM0125 # 01 Y:1998 | 01 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $12,144 | $250 | Implemented |
UM0125 # 04 Y:1998 | 04 | 1998 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $250,120 | $1,500,000 | Not Implemented |
UM0125 # 05 Y:1998 | 05 | 1998 | INSTALL BACK-UP EQUIPMENT | $11,544 | $24,180 | Not Implemented |
UM0120 # 04 Y:1998 | 04 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,783 | $100 | Implemented |
UM0120 # 05 Y:1998 | 05 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $962 | $1,500 | Not Implemented |
UM0120 # 03 Y:1998 | 03 | 1998 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,029 | $1,000 | Implemented |
UM0120 # 02 Y:1998 | 02 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,860 | $1,000 | Implemented |
UM0120 # 01 Y:1998 | 01 | 1998 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $2,335 | $250 | Not Implemented |
UM0120 # 07 Y:1998 | 07 | 1998 | IMPROVE SPACE COMFORT CONDITIONING | $1,440 | $518 | Implemented |
UM0120 # 06 Y:1998 | 06 | 1998 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $14,994 | $5,000 | Not Implemented |
UM0124 # 07 Y:1998 | 07 | 1998 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $158,133 | $30,000 | Implemented |
UM0124 # 04 Y:1998 | 04 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,583 | $3,500 | Not Implemented |