Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
159
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0151 # 05 Y:1999 | 05 | 1999 | USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES | $13,689 | $960 | Not Implemented |
UM0151 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,404 | $1,425 | Implemented |
UM0151 # 04 Y:1999 | 04 | 1999 | USE FILTRATION, CENTRIFUGING TO REMOVE CONTAMINANTS | $5,903 | $11,000 | Implemented |
UM0151 # 01 Y:1999 | 01 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $533 | $542 | Implemented |
UM0151 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,156 | $1,000 | Implemented |
UM0150 # 05 Y:1999 | 05 | 1999 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $35,216 | $50,000 | Not Implemented |
UM0150 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $680 | $300 | Implemented |
UM0150 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,828 | $1,500 | Not Implemented |
UM0150 # 03 Y:1999 | 03 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $3,067 | $880 | Not Implemented |
UM0150 # 04 Y:1999 | 04 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,923 | $1,750 | Not Implemented |
UM0149 # 03 Y:1999 | 03 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,322 | $1,500 | Not Implemented |
UM0149 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $618 | $200 | Implemented |
UM0149 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $836 | $500 | Implemented |
UM0149 # 06 Y:1999 | 06 | 1999 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $8,500 | $40,000 | Implemented |
UM0149 # 05 Y:1999 | 05 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,804 | $0 | Not Implemented |
UM0149 # 07 Y:1999 | 07 | 1999 | EXPAND OPERATIONS INTO UNUSED SPACE | $357,000 | $714,000 | Not Implemented |
UM0149 # 04 Y:1999 | 04 | 1999 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,107 | $10,500 | Not Implemented |
UM0148 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,826 | $2,464 | Implemented |
UM0148 # 05 Y:1999 | 05 | 1999 | EXPAND OPERATIONS INTO UNUSED SPACE | $342,900 | $683,000 | Not Implemented |
UM0148 # 03 Y:1999 | 03 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,056 | $40,000 | Not Implemented |
UM0148 # 02 Y:1999 | 02 | 1999 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,069 | $500 | Not Implemented |
UM0148 # 04 Y:1999 | 04 | 1999 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $12,311 | $40,000 | Implemented |
UM0147 # 05 Y:1999 | 05 | 1999 | RECOVER AND REUSE WASTE MATERIAL | $1,436 | $0 | Implemented |
UM0147 # 03 Y:1999 | 03 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $19,748 | $500 | Not Implemented |
UM0147 # 06 Y:1999 | 06 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $990 | $400 | Not Implemented |