Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
162
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0176 # 06 Y:2000 | 06 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $425,187 | $800,000 | Not Implemented |
UM0176 # 02 Y:2000 | 02 | 2000 | INCREASE AMOUNT OF CONDENSATE RETURNED | $72,582 | $15,000 | Not Implemented |
UM0176 # 04 Y:2000 | 04 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $127,531 | $162,750 | Not Implemented |
UM0176 # 03 Y:2000 | 03 | 2000 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,038 | $2,201 | Not Implemented |
UM0176 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $51,717 | $8,050 | Not Implemented |
UM0176 # 01 Y:2000 | 01 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $733 | $500 | Not Implemented |
UM0175 # 04 Y:2000 | 04 | 2000 | INSULATE BARE EQUIPMENT | $1,824 | $2,288 | Not Implemented |
UM0175 # 06 Y:2000 | 06 | 2000 | INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER | $9,120 | $7,313 | Not Implemented |
UM0175 # 05 Y:2000 | 05 | 2000 | USE OPTIMUM THICKNESS INSULATION | $3,029 | $1,324 | Not Implemented |
UM0175 # 03 Y:2000 | 03 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $4,332 | $6,000 | Not Implemented |
UM0175 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,249 | $600 | Implemented |
UM0175 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $455 | $1,000 | Not Implemented |
UM0174 # 03 Y:2000 | 03 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,906 | $1,200 | Implemented |
UM0174 # 01 Y:2000 | 01 | 2000 | INSULATE BARE EQUIPMENT | $4,136 | $3,600 | Not Implemented |
UM0174 # 05 Y:2000 | 05 | 2000 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $530 | $350 | Implemented |
UM0174 # 06 Y:2000 | 06 | 2000 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $5,080 | $25,000 | Not Implemented |
UM0174 # 07 Y:2000 | 07 | 2000 | MODIFY STARTUP/SHUTDOWN TIMES | $7,800 | $2,000 | Implemented |
UM0174 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,038 | $500 | Implemented |
UM0174 # 02 Y:2000 | 02 | 2000 | USE OPTIMUM THICKNESS INSULATION | $5,460 | $490 | Not Implemented |
UM0173 # 03 Y:2000 | 03 | 2000 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $758 | $700 | Not Implemented |
UM0173 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $225 | Not Implemented |
UM0173 # 01 Y:2000 | 01 | 2000 | INSTALL OCCUPANCY SENSORS | $573 | $800 | Not Implemented |
UM0173 # 04 Y:2000 | 04 | 2000 | UPGRADE CONTROLS ON COMPRESSORS | $3,506 | $800 | Not Implemented |
UM0173 # 05 Y:2000 | 05 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,300 | $750 | Not Implemented |
UM0172 # 02 Y:2000 | 02 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,562 | $1,200 | Implemented |