IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

162

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0176 # 06 Y:2000 06 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $425,187 $800,000 Not Implemented
UM0176 # 02 Y:2000 02 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $72,582 $15,000 Not Implemented
UM0176 # 04 Y:2000 04 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $127,531 $162,750 Not Implemented
UM0176 # 03 Y:2000 03 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $2,038 $2,201 Not Implemented
UM0176 # 05 Y:2000 05 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $51,717 $8,050 Not Implemented
UM0176 # 01 Y:2000 01 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $733 $500 Not Implemented
UM0175 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $1,824 $2,288 Not Implemented
UM0175 # 06 Y:2000 06 2000 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER $9,120 $7,313 Not Implemented
UM0175 # 05 Y:2000 05 2000 USE OPTIMUM THICKNESS INSULATION $3,029 $1,324 Not Implemented
UM0175 # 03 Y:2000 03 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,332 $6,000 Not Implemented
UM0175 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,249 $600 Implemented
UM0175 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $455 $1,000 Not Implemented
UM0174 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,906 $1,200 Implemented
UM0174 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $4,136 $3,600 Not Implemented
UM0174 # 05 Y:2000 05 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $530 $350 Implemented
UM0174 # 06 Y:2000 06 2000 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $5,080 $25,000 Not Implemented
UM0174 # 07 Y:2000 07 2000 MODIFY STARTUP/SHUTDOWN TIMES $7,800 $2,000 Implemented
UM0174 # 04 Y:2000 04 2000 RECOVER WASTE HEAT FROM EQUIPMENT $1,038 $500 Implemented
UM0174 # 02 Y:2000 02 2000 USE OPTIMUM THICKNESS INSULATION $5,460 $490 Not Implemented
UM0173 # 03 Y:2000 03 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $758 $700 Not Implemented
UM0173 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,521 $225 Not Implemented
UM0173 # 01 Y:2000 01 2000 INSTALL OCCUPANCY SENSORS $573 $800 Not Implemented
UM0173 # 04 Y:2000 04 2000 UPGRADE CONTROLS ON COMPRESSORS $3,506 $800 Not Implemented
UM0173 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $2,300 $750 Not Implemented
UM0172 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,562 $1,200 Implemented