Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,723
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0273 # 03 Y:2025 | 03 | 2025 | USE PHOTOCELL CONTROLS | $176 | $295 | n/a |
UU0273 # 04 Y:2025 | 04 | 2025 | INSTALL OCCUPANCY SENSORS | $138 | $350 | n/a |
UU0273 # 01 Y:2025 | 01 | 2025 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,070 | $2,290 | n/a |
UU0273 # 02 Y:2025 | 02 | 2025 | INCREASE EFFICIENCY OF TRUCKS | $12,640 | $23,790 | n/a |
UU0270 # 06 Y:2025 | 06 | 2025 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $17,175 | $12,320 | n/a |
UU0270 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,825 | $17,730 | n/a |
UU0270 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $645 | $820 | n/a |
UU0270 # 05 Y:2025 | 05 | 2025 | PAY UTILITY BILLS ON TIME | $700 | $1,650 | n/a |
UU0270 # 02 Y:2025 | 02 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,940 | $105,710 | n/a |
UU0270 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,350 | $15,900 | n/a |
UU0271 # 01 Y:2025 | 01 | 2025 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $3,038 | $1,248 | n/a |
UU0271 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $335 | $648 | n/a |
UU0271 # 02 Y:2025 | 02 | 2025 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $133 | $1,175 | n/a |
UU0271 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,296 | $11,327 | n/a |
UU0271 # 06 Y:2025 | 06 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $6,046 | $20,000 | n/a |
UU0271 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN WATER LINES AND VALVES | $771 | $5,877 | n/a |
UU0271 # 04 Y:2025 | 04 | 2025 | MINIMIZE WATER USAGE | $3,231 | $23,282 | n/a |
UU0272 # 01 Y:2025 | 01 | 2025 | Hire Energy Manager | $66,000 | $13,000 | n/a |
UU0272 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $18,600 | $207,000 | n/a |
UU0272 # 08 Y:2025 | 08 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $890 | $410 | n/a |
UU0272 # 03 Y:2025 | 03 | 2025 | REDUCE EXCESSIVE BOILER BLOWDOWN | $20,800 | $16,300 | n/a |
UU0272 # 02 Y:2025 | 02 | 2025 | INSULATE BARE EQUIPMENT | $31,500 | $18,800 | n/a |
UU0272 # 04 Y:2025 | 04 | 2025 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $54,700 | $110,000 | n/a |
UU0272 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,950 | $23,600 | n/a |
UU0272 # 11 Y:2025 | 11 | 2025 | OPTIMIZE PLANT POWER FACTOR | $1,250 | $11,200 | n/a |