Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
50
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0078 # 08 Y:2004 | 08 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $810 | $450 | Implemented |
UU0078 # 03 Y:2004 | 03 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,890 | $4,820 | Implemented |
UU0078 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,465 | $405 | Implemented |
UU0078 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,970 | $400 | Implemented |
UU0077 # 03 Y:2004 | 03 | 2004 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $14,890 | $45,000 | Implemented |
UU0077 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,520 | $5,000 | Implemented |
UU0075 # 04 Y:2004 | 04 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,120 | $150 | Implemented |
UU0075 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,590 | $1,320 | Implemented |
UU0075 # 05 Y:2004 | 05 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,270 | $1,000 | Implemented |
UU0074 # 06 Y:2004 | 06 | 2004 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $3,570 | $12 | Implemented |
UU0071 # 01 Y:2004 | 01 | 2004 | OPTIMIZE PLANT POWER FACTOR | $3,645 | $2,000 | Implemented |
UU0071 # 02 Y:2004 | 02 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $3,294 | $0 | Implemented |
UU0071 # 03 Y:2004 | 03 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,655 | $3,894 | Implemented |
UU0071 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,950 | $400 | Implemented |
UU0069 # 02 Y:2004 | 02 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,497 | $268 | Implemented |
UU0069 # 05 Y:2004 | 05 | 2004 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $34,560 | $0 | Implemented |
UU0069 # 03 Y:2004 | 03 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $16,545 | $2,000 | Implemented |
UU0069 # 01 Y:2004 | 01 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,879 | $11,735 | Implemented |
UU0070 # 05 Y:2004 | 05 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $70,000 | $18,000 | Implemented |
UU0070 # 04 Y:2004 | 04 | 2004 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $73,401 | $750,000 | Implemented |
UU0070 # 02 Y:2004 | 02 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $95,199 | $0 | Implemented |
UU0068 # 06 Y:2004 | 06 | 2004 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $12,376 | $1,292 | Implemented |
UU0068 # 01 Y:2004 | 01 | 2004 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $21,193 | $325 | Implemented |
UU0068 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,004 | $244 | Implemented |
UU0067 # 01 Y:2004 | 01 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $25,126 | $0 | Implemented |