IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,465

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0237 # 02 Y:2024 02 2024 REDUCE VENTILATION AIR $7,109 $28,950 Implemented
UU0237 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,340 $23,500 Implemented
UU0237 # 04 Y:2024 04 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $6,350 $8,970 Implemented
UU0237 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,430 $3,000 Implemented
UU0237 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,040 $375 Not Implemented
UU0237 # 07 Y:2024 07 2024 PAY UTILITY BILLS ON TIME $210 $150 Implemented
UU0239 # 02 Y:2024 02 2024 UPGRADE CONTROLS ON COMPRESSORS $18,178 $2,000 Implemented
UU0239 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $21,184 $8,000 Implemented
UU0239 # 03 Y:2024 03 2024 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $9,905 $9,905 Implemented
UU0239 # 04 Y:2024 04 2024 INSULATE BARE EQUIPMENT $6,144 $7,887 Implemented
UU0239 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,050 $1,400 Not Implemented
UU0239 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,011 $3,011 Not Implemented
UU0238 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $7,670 $22,500 Not Implemented
UU0238 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $12,624 $12,621 Implemented
UU0238 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $13,223 $4,080 Implemented
UU0238 # 05 Y:2024 05 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,731 $5,916 Implemented
UU0238 # 04 Y:2024 04 2024 CLEAN CONDENSER TUBES $3,894 $3,890 Implemented
UU0230 # 06 Y:2023 06 2023 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $7,985 $11,730 Not Implemented
UU0230 # 07 Y:2023 07 2023 RECOVER WASTE HEAT FROM EQUIPMENT $32,123 $20,174 Implemented
UU0230 # 08 Y:2023 08 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,790 $1,000 Implemented
UU0230 # 09 Y:2023 09 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,682 $2,000 Not Implemented
UU0230 # 10 Y:2023 10 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,460 $1,000 Implemented
UU0231 # 04 Y:2023 04 2023 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $6,026 $30,128 Not Implemented
UU0231 # 01 Y:2023 01 2023 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $19,636 $127,500 Not Implemented
UU0231 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,898 $263,547 Implemented