IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,723

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0251 # 05 Y:2024 05 2024 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $8,918 $750 Implemented
UU0251 # 06 Y:2024 06 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,210 $6,486 Implemented
UU0251 # 07 Y:2024 07 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $2,290 $5,750 Not Implemented
UU0251 # 08 Y:2024 08 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $180 $300 Not Implemented
UU0252 # 01 Y:2024 01 2024 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $19,754 $108,000 Implemented
UU0252 # 02 Y:2024 02 2024 USE SMALL NUMBER OF HIGH OUTPUT UNITS INSTEAD OF MANY SMALL INEFFICIENT UNITS $53,389 $212,000 Implemented
UU0252 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $1,880 $5,500 Implemented
UU0252 # 04 Y:2024 04 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,070 $4,410 Implemented
UU0253 # 01 Y:2024 01 2024 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $26,630 $43,200 Not Implemented
UU0253 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,113 $26,430 Implemented
UU0253 # 03 Y:2024 03 2024 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $22,211 $18,400 Implemented
UU0253 # 04 Y:2024 04 2024 OPTIMIZE PLANT POWER FACTOR $717 $2,200 Implemented
UU0253 # 05 Y:2024 05 2024 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $150 $450 Not Implemented
UU0248 # 01 Y:2024 01 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $980 $2,600 Implemented
UU0248 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,740 $1,270 Implemented
UU0248 # 03 Y:2024 03 2024 USE AUTOMATIC FLOW CONTROL $820 $4,250 Not Implemented
UU0248 # 04 Y:2024 04 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $33,420 $319,250 Implemented
UU0248 # 05 Y:2024 05 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,380 $133,800 Not Implemented
UU0248 # 06 Y:2024 06 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $940 $3,000 Implemented
UU0248 # 07 Y:2024 07 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,570 $9,360 Not Implemented
UU0247 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $5,970 $3,000 Implemented
UU0247 # 02 Y:2024 02 2024 RECOVER WASTE HEAT FROM EQUIPMENT $1,770 $9,500 Not Implemented
UU0247 # 03 Y:2024 03 2024 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $200,000 $717,040 Not Implemented
UU0247 # 04 Y:2024 04 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $1,060 $1,950 Implemented
UU0247 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $864 $7,540 Implemented