Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,426
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0251 # 03 Y:2024 | 03 | 2024 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $23,190 | $1,500 | n/a |
UU0251 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,830 | $19,570 | n/a |
UU0251 # 07 Y:2024 | 07 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,290 | $5,750 | n/a |
UU0251 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,210 | $6,486 | n/a |
UU0251 # 05 Y:2024 | 05 | 2024 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $8,918 | $750 | n/a |
UU0251 # 01 Y:2024 | 01 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $38,394 | $100,000 | n/a |
UU0251 # 08 Y:2024 | 08 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $180 | $300 | n/a |
UU0251 # 02 Y:2024 | 02 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $27,500 | $13,788 | n/a |
UU0253 # 03 Y:2024 | 03 | 2024 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $22,211 | $18,400 | n/a |
UU0253 # 05 Y:2024 | 05 | 2024 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $150 | $450 | n/a |
UU0253 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,113 | $26,430 | n/a |
UU0253 # 01 Y:2024 | 01 | 2024 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $26,630 | $43,200 | n/a |
UU0253 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $717 | $2,200 | n/a |
UU0250 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,806 | $13,208 | n/a |
UU0250 # 06 Y:2024 | 06 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,753 | $5,720 | n/a |
UU0250 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,742 | $49,723 | n/a |
UU0250 # 04 Y:2024 | 04 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,795 | $5,760 | n/a |
UU0250 # 03 Y:2024 | 03 | 2024 | BURN A LESS EXPENSIVE GRADE OF FUEL | $11,024 | $16,000 | n/a |
UU0250 # 01 Y:2024 | 01 | 2024 | OPTIMIZE PLANT POWER FACTOR | $42,332 | $60,420 | n/a |
UU0246 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,731 | $338 | n/a |
UU0246 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $439 | $900 | n/a |
UU0246 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $8,970 | $42,406 | n/a |
UU0246 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,628 | $3,000 | n/a |
UU0246 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $520 | $123 | n/a |
UU0246 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $3,514 | $9,000 | n/a |