Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
133
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0158 # 04 Y:2019 | 04 | 2019 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $740 | $800 | Not Implemented |
UU0158 # 06 Y:2019 | 06 | 2019 | ELIMINATE/REDUCE AN OPERATION | $445 | $0 | Implemented |
UU0158 # 01 Y:2019 | 01 | 2019 | USE A DIFFERENT OR RECYCLED RAW MATERIAL | $6,933 | $50,000 | Not Implemented |
UU0158 # 05 Y:2019 | 05 | 2019 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $451 | $1,100 | Implemented |
UU0158 # 02 Y:2019 | 02 | 2019 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,811 | $160 | Not Implemented |
UU0158 # 07 Y:2019 | 07 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $306 | $260 | Implemented |
UU0158 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,726 | $2,762 | Implemented |
UU0157 # 02 Y:2019 | 02 | 2019 | OPTIMIZE PLANT POWER FACTOR | $2,079 | $4,000 | Implemented |
UU0157 # 06 Y:2019 | 06 | 2019 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,916 | $3,800 | Implemented |
UU0157 # 07 Y:2019 | 07 | 2019 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,880 | $650 | Implemented |
UU0157 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,321 | $68,567 | Implemented |
UU0157 # 05 Y:2019 | 05 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $314 | $218 | Implemented |
UU0157 # 03 Y:2019 | 03 | 2019 | USE RADIANT HEATER FOR SPOT HEATING | $12,670 | $22,920 | Implemented |
UU0157 # 04 Y:2019 | 04 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $9,094 | $8,488 | Implemented |
UU0156 # 06 Y:2019 | 06 | 2019 | INSULATE BARE EQUIPMENT | $3,874 | $3,125 | Implemented |
UU0156 # 01 Y:2019 | 01 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,712 | $2,024 | Implemented |
UU0156 # 03 Y:2019 | 03 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,768 | $12,634 | Not Implemented |
UU0156 # 05 Y:2019 | 05 | 2019 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $1,315 | $2,600 | Not Implemented |
UU0156 # 02 Y:2019 | 02 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,961 | $2,600 | Not Implemented |
UU0156 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,497 | $2,300 | Implemented |
UU0155 # 02 Y:2019 | 02 | 2019 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $14,015 | $46,625 | Not Implemented |
UU0155 # 03 Y:2019 | 03 | 2019 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $898 | $1,650 | Implemented |
UU0155 # 01 Y:2019 | 01 | 2019 | ADOPT IN-HOUSE MATERIAL GENERATION | $102,278 | $823,000 | Implemented |
UU0154 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $170,761 | $461,313 | Implemented |
UU0154 # 02 Y:2019 | 02 | 2019 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $262,908 | $2,299,950 | Not Implemented |